Laserfiche WebLink
DE$GSIPTION "." ": <br />rm EFFECTIVE 5/1/93 <br />�g-Spg�g SYSTEM <br />BY VALUATION <br />MINIMUM FEE: .00 <br />OAS" <br />The,following shall include bottle gas: <br />For -.the first outlet and/or appliance <br />$10.00 <br />Each outlet and/or appliance <br />$4.50 <br />MINIMUM FEE: $30.00 <br />BOILERS: <br />0 - $100 Valuation <br />$10.00 <br />Each additional $500 or fraction thereafter <br />=8.00 <br />MINIMUM FEE: $30.00 <br />FURNACES AND HEATING BQUIPMENT/UNIT <br />INSTALLED: <br />For the first 100,000 BTU/hour or fractional part <br />$14.00 <br />Each additional 100,000 BTU/hour or fractional part <br />$5.00 <br />(Note: The rating of furnace and heating equipment <br />shall be based on the BTU Input of fuel used/hour. ) <br />MINIMUM FEE: $30.00 <br />SPRINKLER SYSTEMS: <br />SET FEE $30.00 <br />WATER STORAGE TANKS: <br />Up to 1,000 gowns <br />$14.00 <br />Each additional 1,000 gallons or fraction thereof <br />$3.00 <br />MIND" FEE: $W.00 <br />SOLAR WATER HEATER SYSTEM: <br />SET FEE $30.00 <br />ELECTRIC FEES: <br />When an application for a permit Is approved and <br />before a permit is Issued, a fee therefore shall be paid <br />based on the foltowine schedule: <br />No permit will be Issued for a fee of less than: <br />MINIMUM FEE: 130.00 <br />LIGHT OUTLETS: <br />1-10 outlets <br />$10.00 <br />Each additional outlet <br />$.40 <br />SERVICES, SERVICE CHANGES, SWITCHBOARDS OR <br />PANELS: <br />Construction Temporary <br />$14.00 <br />400 Ampere or less <br />$14.00 <br />Each additional 100 ampere over 400 <br />$5.00 <br />MINIMUM FEE: $30.00 <br />-3- <br />