Laserfiche WebLink
When work, for which a permit is required, is started <br />prior to obWning the permit, the fees shown in this <br />Resolution shell be doubled. Payment of a double fee <br />shell not relieve any person from fully complying with <br />the requirements of applicable ordinances or technical <br />codes in the execution of the work, nor shall the <br />payment of a double fee relieve any person from <br />penalties as defined elsewhere in the Indian River <br />County Code of Laws and Ordinances. <br />REINSPECTION FEE: <br />The said fees smell include payment for the permit and <br />for inspection of work, after the same shall have been <br />completed. If the inspector shall, upon his inspection <br />after completion of the work or apparatus, find that <br />the same does not conform to and comply with the <br />requirements established by the County, he shall <br />notify the contractor, indicating the corrections <br />required; and when the inspector is notified that the <br />corrections have been made, he will again inspect the <br />work or apparatus without further charge; but, when <br />extra inspection trips are necessary, due to any of the <br />following reasons, a charge shall be made for each trip <br />payable prior to reinspection: <br />Wrong address <br />Condemned work resulting from faulty construction <br />Repairs/corrections not made when inspection called <br />Work not ready for inspection when called <br />Payment of reinspection fee shell be made prior to final <br />inspection and/or Certificate of Occupancy. <br />SET FEE: $30.00 <br />$30.00 <br />SET FEE: $100.00 <br />DOUBLE FEE <br />$30.00 <br />LICENSING CERTIFICATION: <br />(Reference Indian River County Ordinance Title IV, FEES EFFECTIVE 10/1/93 <br />APPLICATION FEE: <br />'ANNUAL RENEWAL FEE: <br />VMM2UD"3-IWAPB- sr. <br />-6- <br />