Laserfiche WebLink
Lit <br />DESCRIPTION <br />CURRENT FEE <br />NEW FEES <br />As aidootid.in existing resolution <br />EFFECTIVE 5/1/93 <br />GA8 <br />7777 <br />The following shall include bottle gas: <br />For the first outlet and/or appliance <br />For each additional outlet and/or appliance <br />For change from a master to an individual <br />meter <br />#4.50 <br />#1.50 <br />#2.00 <br />#10.00 <br />#2.50 per outlet <br />For multiple meters at one location: <br />First meter <br />#2.50 <br />Each Addtl meter <br />#1.00 <br />For major repairs to gas pipe where no <br />fixture or appliance installation is involved <br />#3.00 <br />NIINIMUM FEE: #30.00 <br />BOILERS: <br />Ytnimum permit fee for installations not to <br />#5.00 <br />#10.00 <br />exceed #100 <br />Each #500 or fraction thereafter <br />#3.00 <br />#6.00 <br />MINIMUM FEE: #30.00 <br />FURNACES AND HEATING <br />EQUIPMENT/UNIT INSTALLED: <br />For the first 100,000 BTU/hour or <br />#7.00 <br />#12.00 <br />r ctdpart <br />eb ditional 100,000 BTU/hour or <br />Eaadditional <br />#3.00 <br />#5.00 <br />fractional part <br />(Note: The rating of furnace and heating <br />(Note: <br />MINIMUM FEE: #30.00 <br />equipment shall be based on the BTU input <br />of fuel used/hour. <br />WELLS: <br />Delete - Environmental <br />Drilling or dimseinz <br />#5.00 <br />Health Department <br />SPRINKLER SYSTEMS: <br />#4.00 <br />SET FEE #30.00 <br />WATER STORAGE TANKS: <br />Up to 1,000 gallons <br />#6.00 <br />#12.00 <br />Each additional 1,000 gallons or fraction <br />#1.50 <br />#3.00 <br />MINIMUM FEE: #30.00 <br />SOLAR WATER HEATER SYSTEM: <br />#7.50 <br />SET FEE #30.00 <br />ELECTRIC FEES: <br />When application for permit is approved <br />and before a permit is issued, a fee shall be <br />maid on the followinK schedule or rates: <br />No permit will be issued for a fee of less <br />than: <br />$5.00 <br />MINIMUM FEE: #30.00 <br />LIGHT OUTLETS: <br />1 - 10 Outlets: <br />#10.00 <br />1-8 outlets, inclusive (minimum) <br />#5.00 <br />Over 8 outlets, the minimum charge for the <br />Each Addtl. outlet <br />first 9 outlets plus each additional outlet <br />#.10 <br />#.20 <br />