My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-106A
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-106A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 1:52:55 PM
Creation date
8/12/2019 3:39:51 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/16/2019
Control Number
2019-106A
Agenda Item Number
8.E.
Entity Name
XGD Systems, LLC
Subject
Jungle Trail Shoreline Stabilization Project
Project Number
IRC-1823
Bid Number
2019050
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
276
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. lose or damage to the completed Pro <br />resulting from fire or other insured peril or <br />cause of loss covered by any property <br />or part thereof by OWNER during partial <br />14.04, or after final <br />paragraph 14.07. <br />C. Any insurance policy <br />covering any loss, damage <br />referred to in paragraph <br />provisions to the effect that in <br />payment pursuant to <br />maintained by OWNER <br />or consequential lose <br />5.07.B shall contain <br />the event of payment of <br />CONTRACTOR, Subcontractors, ENGINEER, or <br />ENGINEER's Consultants and the officers, directors, <br />partners, employees, agents, and other consultants <br />5.08 Receipt and Application of Insurance <br />Proceeds <br />A. Any insured loss under the policies of <br />• • A. <br />1 . <br />fiduciary for the insureds, as their interests may <br />app ar, subject to the requirements of any applicable <br />-•--- - -- - - - - -- -- .e• --e: _ . • • <br />shall deposit in a separate account any money so <br />agreement as the parties in interest may reach. If no <br />other special agreement is reached, the damaged <br />• <br />and the cost thereof covered by an appropriate <br />Change Order or Written Amendment. <br />B. OWNER as fiduciary shall have power to <br />adjust and settle any loss with the insurers unles., one <br />exercise of this power. If such objection be made, <br />parties in interest may reach. If no such agreement <br />among the parties in interest is reached, OWNER as <br />fiduciary shall adjust and settic the Ions with the <br />insurers and, if required in writing by any party in <br />interest, OWNER as fiduciary shall give bond for the <br />5.09 Acceptance of Bonds and Insurance; Option <br />to Replace <br />A. If either OWNER or CONTRACTOR has any <br />objection to the coverage afforded by or other provi <br />dons of the Bonds or <br />dance with Article 5 on the basis of non conformance <br />receipt of the certificates <br />(or other evidence <br />and CONTRACTOR shall each provide to the other <br />provided as the other may reasonably request. If <br />party in writing of such failure to purchase prior to the <br />start of the Work, or of such failure to maintain prior to <br />any change in the required coverage. Without <br />may- - - - <br />protect such other party's interests at the expense of <br />5.10 Partial Utilization, Acknowledgment of <br />Property Insurer <br />A. If OWNER finds it necessary to occupy or use <br />a portion or portions of the Work prior to Substantial <br />Completion of all the Work as provided in paragraph <br />14.05, no such use or occupancy shall commence <br />before the insurers providing the property insurance <br />pursuant to paragraph 5.06 have acknowledged notice <br />thereof and in writing effected any changes in cover- <br />age necessitated thereby. The insurers providing the <br />property insurance shall consent by endorsement on <br />the policy or policies, but the property insurance shall <br />not be canceled or permitted to lapse on account of <br />any such partial use or occupancy. <br />ARTICLE 6 - CONTRACTOR'S RESPONSIBILITIES <br />6.01 Supervision and Superintendence <br />A. CONTRACTOR shall supervise, inspect, and <br />direct the Work competently and efficiently, devoting <br />such attention thereto and applying such skills and <br />expertise as may be necessary to perform the Work in <br />accordance with the Contract Documents. CON- <br />TRACTOR shall be solely responsible for the means, <br />methods, techniques, sequences, and procedures of <br />construction, but CONTRACTOR shall not be <br />responsible for the negligence of OWNER or <br />ENGINEER in the design or specification of a specific <br />00700 - General Conditions REV 5-10-13 <br />00700-18 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1823 Jungle Trail Shoreline Stabilization Project (2018)11-Admin\Bid Documents\Master Contract Documents\00700 - General <br />Conditions REV 5-10-13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.