My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-106A
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-106A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 1:52:55 PM
Creation date
8/12/2019 3:39:51 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/16/2019
Control Number
2019-106A
Agenda Item Number
8.E.
Entity Name
XGD Systems, LLC
Subject
Jungle Trail Shoreline Stabilization Project
Project Number
IRC-1823
Bid Number
2019050
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
276
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00948 - Work Change Directive <br />No. <br />DATE OF ISSUANCE: EFFECTIVE DATE: <br />OWNER: Indian River County <br />CONTRACTOR: <br />Project: JUNGLE TRAIL SHORELINE STABILIZATION PROJECT <br />OWNER's Project No. IRC -1823 <br />You are directed to proceed promptly with the following changes: <br />Description: <br />Purpose of Work Change Directive: <br />Attachments: (List documents supporting change) <br />If OWNER or CONTRACTOR believe that the above change has affected Contract Price any <br />Claim for a Change Order based thereon will involve one or more of the following methods as <br />defined in the Contract Documents. <br />Method of determining change in Method of determining change in <br />Contract Prices Contract Times <br />❑ Unit Prices <br />0 Lump Sum <br />n Other: <br />n By Change Order: <br />❑ Contractor's Records <br />❑ Engineer's Records <br />fl Other: <br />❑ By Change Order: <br />Estimated increase (decrease) of this Work Estimated increase (decrease) in Contract Times: <br />Change Directive <br />Substantial Completion: days; <br />Ready for Final Completion: days. <br />If the change involves an increase, the estimated If the change involves an increase, the estimated <br />amount is not to be exceeded without further time is not to be exceeded without further <br />authorization. authorization. <br />ACCEPTED: <br />By: <br />RECOMMENDED: <br />By: <br />APPROVED: <br />By: <br />CONTRACTOR (Signature) <br />Date: <br />ENGINEER (Signature) <br />Date: <br />OWNER (Signature) <br />Date: <br />* * END OF SECTION * <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1823 Jungle Trail Shoreline Stabilization Project (2018)\1-Admin\Bid <br />Documents\Master Contract Documents\00948 - Work Change Directive Rev 06-2013.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.