Laserfiche WebLink
PROJECT NAME: 1823 JUNGLE TRAIL SHORELINE STABILIZATION PROJECT <br />PROJECT NO. IRC -1823 BID NO. 2019050 <br />BIDDER'S NAME <br />. m <br />1,4, ..-.. F.�,:,, <br />Descrip3atio. n ,t.' `-✓�1 fi''" F ' 11-:,1,4,* <br />Znit <br />axUtP <br />:QuanfrtE+y. <br />iAvAmgi .. <br />101-1 <br />MOBILIZATION <br />LS <br />1 <br />102 <br />MAINTENANCE OF TRAFFIC <br />LS <br />1 <br />104-1 <br />SILT FENCE <br />LF <br />750 <br />104-2 <br />FLOATING TURBIDITY BARRIER <br />LF <br />500 <br />110 <br />CLEARING & GRUBBING <br />LS <br />1 <br />120-1 <br />EXCAVATION, REGULAR (ROADWAY) <br />LS <br />1 <br />120-6 <br />EMBANKMENT (COMPACTED IN PLACE) <br />LS <br />1 <br />120-1100 <br />GRADING <br />LS <br />1 <br />530-3-3 <br />RIP RAP (RUBBLE - 2' DIA. LIMESTONE) <br />TN <br />1,325 <br />580-1 <br />LANDSCAPE (RED MANGROVE - 1 GAL) <br />EA <br />75 <br />580-2 <br />LANDSCAPE (BLACK MANGROVE - 1 GAL) <br />EA <br />50 <br />580-3 <br />LANDSCAPE (BUTTONWOOD - 1 GAL) <br />EA <br />75 <br />580-4 <br />LANDSCAPE (SAND CORDGRASS - 1 GAL) <br />EA <br />70 <br />580-5 <br />LANDSCAPE (SALTGRASS - 1 GAL) <br />EA <br />70 <br />580-6 <br />LANDSCAPE (SEA OXEYE DAISY - 1 GAL) <br />EA <br />70 <br />901 <br />COARSE AGGREGATE - BEDDING STONE (3"-5") <br />TN <br />200 <br />985-1 <br />GEOSYNTHETIC MATERIALS (FILTER FABRIC) <br />SF <br />6,550 <br />985-2 <br />GEOSYNTHETIC MATERIALS (COCONUT JUTE <br />MATERIAL) <br />SF <br />6,550 <br />999 <br />RECORD DRAWINGS/AS-BUILTS <br />LS <br />1 <br />JUNGLE TRAIL SHORELINE STABILIZATION PROJECT SUB -TOTAL <br />FORCE ACCOUNT <br />$30,000.00 <br />TOTAL PROJECT ESTIMATE (INCLUDING FORCE ACCOUNT) TOTAL <br />TOTAL PROJECT BID AMOUNT IN WORDS <br />NOTE: IF THERE IS A DISCREPANCY BETWEEN THE PLANS (SUMMARY OF PAY ITEMS) <br />AND THE ITEMIZED BID SCHEDULE. THE BID SCHEDULE WILL BE UTILIZED FOR BIDDING PURPOSES. <br />SF=Square Feet LS=Lump Sum EA=Each LF=Linear Feet TN=Ton <br />00310-3 <br />F: \Public Works\ENGINEERING DIVISION PROJECTS\1823 Jungle Trail Shoreline Stabilization Project (2018)\1-Admin\Bid DocumentsWlaster Contract <br />Documents DocumentsURC 1823_ I B S_20190520 <br />