Laserfiche WebLink
The determination of the appropriate method(s) of compliance is the complete and sole <br />responsibility of the BIDDER. Such methods will not be checked by the OWNER or <br />ENGINEER for accuracy, completeness or any other purpose. The OWNER and <br />ENGINEER shall have no responsibility to review or check the BIDDER's compliance <br />with the Trench Safety Standards. <br />8. The BIDDER, in submitting this bid, represents that it has obtained and considered all <br />available geotechnical information, has utilized said geotechnical information and that, <br />based on such information and the BIDDER's own information, the BIDDER has <br />sufficient knowledge of the Project's surface and subsurface site conditions and <br />characteristics to assure BIDDER's compliance with the applicable Trench Safety <br />Standards in designing the trench safety system(s) for the Project. <br />BIDDER: <br />By: <br />Position or Title: <br />Date: <br />STATE OF <br />COUNTY OF <br />Personally appeared before me, the undersigned authority, <br />who after first being sworn by me, affixed his/her signature in the space provided above on this <br />day of , 20 <br />Notary Public, State at large <br />My Commission Expires: <br />* * END OF SECTION * * <br />00454 - Florida Trench Safety Act - REV 04-07 <br />00454-2 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS \1823 Jungle Trail Shoreline Stabilization Project (2018)\1-Admin\Bid DocumentslMaster Contract Documents \00454 - <br />Florida Trench Safety Act - REV 04-07.doc <br />