My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-106A
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-106A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 1:52:55 PM
Creation date
8/12/2019 3:39:51 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/16/2019
Control Number
2019-106A
Agenda Item Number
8.E.
Entity Name
XGD Systems, LLC
Subject
Jungle Trail Shoreline Stabilization Project
Project Number
IRC-1823
Bid Number
2019050
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
276
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT NAME: 1823 JUNGLE TRAIL SHORELINE STABILIZATION PROJECT <br />PROJECT NO. IRC -1823 BID NO. 2019050 <br />BIDDER'S NAME XGD Systems, LLC <br />ttem; No. <br />Descilil or <br />gra unit Ptstee. <br />1r`: <br />- Amount <br />101-1 <br />MOBILIZATION <br />LIS <br />$7,225.00 <br />1 <br />$7,225.00 <br />102 <br />MAINTENANCE OF TRAFFIC <br />LS <br />$2,299.52 <br />1 <br />$2,299.52 <br />104-1 <br />SILT FENCE <br />LF <br />$3.34 <br />750 <br />$2,505.00 <br />104-2 <br />FLOATIG TURBIDITY BARRIER <br />LF <br />$29.75, <br />500 <br />$14,875.00 <br />110 . <br />C1_.'EA' NG & GRUBBING <br />LS <br />S12,475.92 1 <br />A <br />$12,475.92 <br />120-1 pEXCAVATION, <br />REGULAR (ROADWAY) <br />LS <br />$13,128.15 <br />1 <br />$13,128.15 <br />120-6 <br />EMBANKMENT (COMPACTED IN PLACE) <br />LS <br />$7,943.78 <br />1 <br />$7,943.78 <br />120-1100 <br />GRADING <br />LS <br />$2,843.04 <br />1 <br />$2,843.04 <br />530-3-3 <br />RP RAP (RUBBLE - 2' DIA. LIMESTONE) <br />TINT <br />` <br />579.40 <br />C <br />1x,325 <br />5105,205.00 <br />580-1 <br />LANDSCAPE (RED MANGROVE - 1 GAL) <br />EA <br />$23.1.6 <br />75 <br />$1,737.00 <br />580-2 <br />LANDSCAPE (BLACK MANGROVE - 1 GAL) <br />EA <br />$23.16 <br />50 <br />$1,158.00 <br />580-3 <br />LANDSCAPE (BUTTONWOOD - 1 GAL) <br />EA <br />$22.89 <br />75 <br />$1,716.75 <br />580-4 <br />LANDSCAPE (SAND CORDGRASS - 1 GAL) <br />EA <br />$11.82 <br />70 <br />$827.40 <br />580-5 <br />LANDSCAPE (SALTPRA'SS - n GAL <br />EA <br />5712.62 <br />70 <br />$883.40 <br />580-6 <br />LANDSCAPE ,(SEA OXEYE ODAISY - 'I GAIL) <br />EA A <br />$12.62 <br />70 , <br />5883.40 . <br />901 <br />COARSE AGGREGATE - BEDDING STONE (3"-5") <br />TN <br />} $72.10 <br />200 <br />$14,420.00 <br />985-1 <br />GEOSYNTHETIC MATERIALS (FILTER FABRIC) <br />SF <br />$0.26 <br />6,550 <br />$1,703.00 <br />985-2 <br />GEOSYNTHETIC MATERIALS (COCONUT JUTE <br />MATERIAL) <br />SF <br />$0.28 <br />6,550 <br />$1,834.00 <br />999 <br />,RECORD DRAWINGS/AS-HUMLTS <br />. LS <br />$1,672.38 <br />1 <br />$1,672.38 <br />JUNGLE TRAIL SHORELINE STABILIZATION PROJECT SUB -TOTAL <br />$195,335.74 <br />FORCE ACCOUNT <br />$30,000.00 <br />TOTAL PROJECT ESTIMATE (INCLUDING FORCE ACCOUNT) TOTAL <br />$225,335.74 <br />TOTAL PROJECTBID AMOUNT IN WORDS Two Hundred Twenty Five Thousand Three Hundred <br />flinty ty Five Dollars and Seventy Four Cents <br />NOTE: IF THERE IS A DISCREPANCY BETWEEN THE PLANS (SUMMARY OF PAY ITEMS <br />AND THE ITEMIZED BID SCHEDULE. THE BID SCHEDULE WILL BE UTILIZED FOR BIDDING PURPOSES. <br />SF=Square Feet LS=Lump Sum EA=Each LF=Linear Feet TN=Ton <br />00310-3 <br />F:tPubic Works\ENGINEER1NG D1V1S)ON PROJECTS11823 Jungle Ta'SYyoreivre Stabit¢abon Project (2015)\1-Admin\Bid DocumentsWlaster Contract <br />DocumentsURC 1823_18S_2019052D <br />
The URL can be used to link to this page
Your browser does not support the video tag.