Laserfiche WebLink
SECTION 00454 - Sworn Statement Under the Florida Trench Safety Act <br />THIS FORM MUST BE SIGNED BY THE BIDDER WHO WILL BE RESPONSIBLE <br />FOR THE EXCAVATION WORK ("BIDDER"), OR ITS AUTHORIZED <br />REPRESENTATIVE, IM THE PRESENCE CIF A'NOTARY PUBLIC AUTHORIZED TO <br />ADMINISTER OATHS. <br />1. This Sworn Statement is submitted with Project No. IRC -1823 for JUNGLE TRAIL <br />SHORLINE STABILIZATION PROJECT <br />2. This Sworn Statement is submitted by XGD Systems, LLC <br />(Legal Name of Entity Summtirrg:`Saont Statement) <br />hereinafter 'BIDDER". The BIDDER's address is <br />415 NW Flagler Ave, Stuart, FL 34994 <br />BIDDER's Federal Employer Identification Number (FEIN) is 20-1254730 <br />3. My name is Geoff Corlett and my relationship to the BIDDER <br />(Print Name of Individual Signing) <br />ys CFO <br />tPositnan or Tine) <br />I certify, through my signature at the end of this Sworn Statement, that I am an <br />authorized representative of the BIDDER. <br />4. The Trench Safety Standards that will be in effect during the construction of this Project <br />are contained within the Trench Safety Act, Section 553.60 et.seq. Florida Statutes and <br />refer to the applicable Florida Statue(s) and/or OSHA Regulation(s) and include the <br />"effective date" in the citation(s). Reference to and compliance with the applicable <br />Florida Stats rtes) and OSHA Regtthation(s) is the complete and sole responsibility of the <br />BIDDER. Such reference v et not be checked by OWNER or ENGINEER and they shalli <br />have no responsibility to review or check the BIDDER°s compliance with the Trench <br />Safety Standards. <br />5. The BIDDER assures the OWNER that it will comply with the applicable Trench Safety <br />Standards. <br />6. The BIDDER has allocated and included in its bid the total amount of $ 0.00 <br />based on the linear feet of trench to be excavated over five (5) feet deep, for compliance <br />with the applicable Trench Safety Standards, and intends to corgply with said standards <br />by instituting the ,following specific method(s) of coiropliance,on this Project: <br />Not Applicable <br />The determination of the appropriate method(s) of compliance is the complete and sole <br />Pasponsthisiity of the BIDDER. Such methods will not be checked by the OWNER or <br />ENGINEER for accuracy, completeness, or any other purpose. The OWNER and <br />ENGINEER shall have no responsibility to review or check the BIDDER's compliance <br />with the Trench Safety Standards. <br />7 The BIDDER has allocated and included in its bid the total amount of $ 0.00 <br />based on the square feet of shoring to be used for compliance with shoring safety <br />requirements and intends to comply with said shoring requirements by instituting the <br />.fotlowing specific n ethxo i(s) of compliance on this Project: Not Applicable <br />00454 - Florida Trench Safety Act - REV 04-07 <br />00454 - 1 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS11823 Jungle Trail Shoreline Stabilization Project (2018r.1-Admin\Bid Documents Master Contract Dowments\00454 - <br />Florida Trench Safety Act - REV 04-07,doc <br />