Laserfiche WebLink
SECTION 00520 - Agreement (Public Works) <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br />State of Florida organized and existing under the Laws of the State of Florida. (hereinafter called <br />OWNER) and XGD Systems, LLC (hereinafter called CONTRACTOR). OWNER and <br />CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as follows: <br />ARTICLE 1 - WORK <br />1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract <br />Documents. The Work is generally described as follows: <br />Project consists of the placement of riprap along approximately 750 linear feet <br />of shoreline along the east bank of the Indian River Lagoon and on the west side of <br />Jungle Trail in Indian River County, Florida. This work will include grading, excavation, <br />and landscaping. <br />ARTICLE 2 - THE PROJECT <br />2.01 The Project for which the Work under the Contract Documents may be the whole or only a <br />part is generally described as follows: <br />Project Name: JUNGLE TRAIL SHORELINE STABILIZATION PROJECT <br />County Project Number: 1RC-1823 <br />Bid Number: 2019050 <br />Project Address: Jungle Trail, Wabasso, Florida 32963 <br />ARTICLE 3 — ENGINEER <br />3.01 The Indian River County Public Works Department is hereinafter called the ENGINEER <br />and will act as OWNER's representative, assume all duties and responsibilities, and have <br />the rights and authority assigned to ENGINEER in the Contract Documents in connection <br />with the completion of the Work in accordance with the Contract Documents. <br />ARTICLE 4 - CONTRACT TIMES <br />4.01 Time of the Essence <br />A. All time limits for Milestones, if any. Substantial Completion, and completion and readiness <br />for final payment as stated in the Contract Documents are of the essence of the Contract. <br />4.02 Days to Achieve Substantial Completion. Final Completion and Final Payment <br />A. The Work will be substantially completed on or before the 60th calendar day after the date <br />when the Contract Times commence to run as provided in paragraph 2.03 of the General <br />Conditions, and completed and ready for final payment in accordance with paragraph <br />14.07 of the General Conditions on or before the 90th calendar day after the date when the <br />Contract Times commence to run. <br />****,.**********,.*«««***********1«*******.***** ******** *********** ** <br />00520 - P greerneM (Public Wvrka) REV )O -1B <br />00520 - 2 <br />8.12018-2019 FY (2019000)\2019050 Jungle Trail Shoreline Stabilization\00520 - Agreement (Public Works) REV 10-18.doc <br />