My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-106A
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-106A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 1:52:55 PM
Creation date
8/12/2019 3:39:51 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/16/2019
Control Number
2019-106A
Agenda Item Number
8.E.
Entity Name
XGD Systems, LLC
Subject
Jungle Trail Shoreline Stabilization Project
Project Number
IRC-1823
Bid Number
2019050
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
276
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00630 - Certificate of Substantial Completion <br />Date of Issuance: , 20 <br />OWNER: Indian River County <br />CONTRACTOR' <br />CONTRACT FOR: JUNGLE TRAIL SHORELINE STABILIZATION PROJECT <br />Project No.: IRC -1823 <br />Project Description: Project consists of the placement of riprap along approximately 750 <br />linear feet of shoreline along the east bank of the Indian River Lagoon and on the west <br />side of Jungle Trail in Indian River County, Florida. This work will include grading, <br />excavation, and landscaping. <br />OWNER's Bid No. 2019050 <br />This Certificate of Substantial Completion applies to all Work under the Contract Documents or <br />to the following specified parts thereof: <br />To. <br />OWNER <br />And To. <br />CONTRACTOR <br />The Work to which this Certificate applies has been inspected by authorized representatives of <br />OWNER, CONTRACTOR and ENGINEER, and that Work is hereby declared to be <br />substantially complete in accordance with the Contract Documents on <br />DATE OF SUBSTANTIAL COMPLETION <br />A tentative list of items to be completed or corrected is attached hereto. This list may not be all- <br />inclusive, and the failure to include an item in it does not alter the responsibility of <br />CONTRACTOR to complete all the Work in accordance with the Contract Documents. The <br />items in the tentative list shall be completed or corrected by CONTRACTOR within <br />calendar days of the above date of Substantial Completion. <br />00630 - Certificate of Substantial Completion REV 04-07 <br />00630 - 1 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1823 Jungle Trail Shoreline Stabilization Project (2018)\1-Admin\Bid Documents\Master Contract Documents100630 - <br />Certificate of Substantial Completion REV 04-07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.