Laserfiche WebLink
Downsize 1 %2" meter to 1", includes parts & <br />labor <br />50 <br />200.00 <br />$10,000.00 <br />Downsize 3" meter to 2", includes parts & <br />labor <br />0 <br />$620.00 <br />$0.00 <br />Downsize 4" meter to 2", includes parts & <br />labor <br />0 <br />$725.00 <br />$0.00 <br />Upsize 1 1/2" meter to 2", plus meter install <br />25 <br />$300.00 <br />$7,500.00 <br />MDM Annual Hosting (Starts 6 months after <br />Project Completion) <br />0 <br />$2.00 <br />$0.00 <br />MDM Data Modification per Unit <br />0 <br />$1.50 <br />$0.00 <br />Subtotal <br />$191,350.00 <br />Total <br />$3,083,663.80 <br />WARRANTEE <br />All installation work performed under this contract will be guaranteed for a period of one year <br />from the date of installation for defects in workmanship and will be repaired at the expense of <br />National. Leaks reported within thirty days from date of installation, five feet before or five <br />feet after the meter will be repaired by the contractor at no additional expense to the County <br />or its customers within four hours after notification. Leaks reported after 30 days will be <br />repaired at no additional expense to the County or its customers if determined to be the result <br />of defect in workmanship within six hours after notification. Warranty is limited to National as <br />stated. National is not responsible for failed or non -working units. Units installed that do not <br />show any consumption — stuck or zero read will be replaced at no additional charge to the <br />utility and the meter returned to manufacturer for warranty. Meters tested and read with <br />photo proof unit was transmitting at time of install are covered by manufacturer warranty and <br />not National. Additional installation/labor fees may apply. <br />PERFORMANCE CRITERA <br />Performance Criteria <br />Measurement <br />Corrective action <br />Meter Installation <br />Failure Rate <br />Number of installations that must be <br />revisited by National crews after <br />installation <br />>_4 in a month — National must <br />provide quality assurance <br />inspections by Project Supervisor of <br />each installation for three weeks or <br />until rate improves <br />Attendance to <br />Project Management <br />mtgs <br />Project Coordinator and/or Project <br />Supervisor or alternate attend all <br />scheduled PM calls with IRC PM <br />Escalation to executive leadership <br />with leadership attendance in <br />subsequent meetings <br />66 <br />