Indian River County Work Order Number 2018007-3 <br />Sector 7 Beach and Dune Restoration Project Exhibit 1 - Scope of Work <br />Exhibit 1 <br />Scope of Work <br />2019 Reconnaissance Hardbottom Survey <br />Introduction: The "Indian River County Beach Preservation Plan Update" (Plan, dated February <br />2015) recommends re -nourishment of beaches within Sector 7, which extends from Florida <br />Department of Environmental Protection (FDEP) reference monuments R-97 to R-108 (Project). <br />The Projectextends approximately 2.2 miles; a majority of the Projectarea is designated by FDEP <br />as critically eroded. Sector 7 was damaged by Hurricane Matthew in 2016 and Hurricane Irma in <br />2017; beach re -nourishment is warranted. Construction and re -nourishment of the Project area <br />is anticipated between November 2020 and May 2021 - outside the sea turtle nesting season. <br />The COUNTY previously authorized Work Order Number 2018007-1 for design and permitting of <br />the Project. In concert with permit applications, FDEP has (a) identified the existence of recently <br />exposed nearshore hardbottom, and (b) required a reconnaissance survey to map and <br />characterize existing nearshore hardbottom that is susceptible to adverse impacts from the <br />proposed Sector 7 re -nourishment. The objective of the survey is to document the current types, <br />and spatial distribution of hardbottom resources just offshore of the beach nourishment Project <br />area, and in the vicinity of the potential pipeline corridor. The survey is expected to (a) be <br />conducted between August and September 2019, and (b) frame future monitoring activities. The <br />survey work will be performed by CSA Ocean Sciences Inc. (CSA) and Morgan & Eklund, Inc. <br />(M&E) under sub -contract with Coastal Technology Corporation (Coastal Tech), who will oversee <br />and incorporate results into the preliminary design permit sketches for modification of permit <br />applications. The following describes the specific scope of work under this Work Order. <br />Task 1.1 Side -scan Survey: A side -scan survey will be performed by Morgan & Eklund, Inc. <br />to verify the locations of hardbottom within the Project area seaward of the 2007 permitted <br />Equilibrated Toe of Fill (ETOF). The side -scan survey will be performed between FDEP R - <br />monuments R-97 and R-111 and offshore a distance of approximately 350 m. The survey will also <br />be conducted within 25m of the potential pipeline corridor. Hardbottom mapping data collected <br />during the side -scan survey will be recorded and provided digitally. Coastal Tech will compare the <br />side -scan survey to the 2019 beach profile data provided by the County and the preliminary <br />habitat map and incorporate this information into the permit sketches. <br />Task 1.2 Preliminary Habitat Map: Via desktop, CSA will characterize the Projectarea utilizing <br />information available on the condition and distribution of hardbottom resources. This information <br />may include historical and current sonar surveys and diver delineated hardbottom edges, previous <br />biological monitoring data and other applicable information for the Project Area. The work will <br />include the existing hardbottom distribution (nearshore, intermediate, offshore) within the Project <br />area and under the influence of the Project (300 m updrift, 900 m downdrift, and 30 m seaward <br />of the current beach and seaward of the 2007 permitted ETOF) will be determined. In addition, <br />the survey area for the proposed pipeline corridor shall encompass all areas within the corridor <br />as well as areas 25 m on either side of the corridor. <br />Page 1 of 2 <br />July 31, 2019 <br />