My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/02/2019
CBCC
>
Meetings
>
2010's
>
2019
>
07/02/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2019 1:32:09 PM
Creation date
9/11/2019 11:32:29 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
07/02/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Order No. 16 <br />Bridge Repairs for C.R. 512 bridges <br />over the St. Sebastian River <br />EXHIBIT C — TIME SCHEDULE <br />Upon authorization to proceed by the COUNTY, final design documents are expected <br />to take approximately seven (6) months from the Notice to Proceed (NTP). <br />NTP contingent upon BOCC approval <br />Interim Submittal (80% Design Drawings) <br />Final Submittal (100% Design Drawings) <br />3 months following NTP <br />6 months following NTP <br />(THE REMAINDER OF THIS PAGE IS INTENTIONALLY BLANK) <br />Page 5 of 6 <br />37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.