My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/02/2019
CBCC
>
Meetings
>
2010's
>
2019
>
07/02/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2019 1:32:09 PM
Creation date
9/11/2019 11:32:29 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
07/02/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THIRD AMENDMENT TO AGREEMENT FOR PROFESSIONAL <br />SERVICES BETWEEN INDIAN RIVER COUNTY AND BOWMAN <br />CONSULTING GROUP, LTD <br />THIS THIRD AMENDMENT TO AGREEMENT FOR PROFESSIONAL <br />SERVICES BETWEEN INDIAN RIVER COUNTY AND BOWMAN CONSULTING <br />GROUP, LTD ("Third Amendment") is entered into as of the day of July, 2019 by and <br />between Indian River County, a political subdivision of the State of Florida, whose address is 1801 <br />27th Street, Vero Beach, Florida, 32960 ("County"), and Bowman Consulting Group, LTD., a <br />Virginian corporation authorized to do business in Florida, whose address is 3863 Centerview <br />Drive, Suite 300, Chantilly, VA 20151 (the "Consultant"). <br />RECITALS <br />WHEREAS, on May 23, 2018, County and Consultant entered into an Agreement for <br />Professional Services for design and construction services for 58th Avenue Pavement Reclamation <br />and Resurfacing from 57th Street to 85th Street (the "Agreement"); and <br />WHEREAS, on June 12, 2018, the County and Consultant entered into a First Amendment <br />to the Agreement for preparation of waterline designs; bid services, construction engineering <br />services and project turnover of utility relocations associated with the construction of 58th Avenue <br />Pavement Reclamation and Resurfacing from 57th Avenue to 85th Street/CR 510; and <br />WHEREAS, on December 11, 2018, the County and Consultant entered into a Second <br />Amendment to the Agreement for the design of a communication network throughout the project <br />limits with the construction of 58th Avenue Pavement Reclamation and Resurfacing from 57th <br />Avenue to 85th Street/CR 510; and <br />WHEREAS, County and Consultant desire to amend the Agreement to provide design <br />upgrades to 58th Avenue by way of roadway widening between 77th Street and 81st Street to <br />accommodate the addition of a center turn -lane, pavement markings and signage to assist with <br />traffic flow into County owned Fairgrounds.; and <br />NOW THEREFORE, in consideration of the mutual undertakings herein and other good and <br />valuable consideration, the receipt and adequacy of which is hereby acknowledged, the parties <br />agree, as follows: <br />1. Recitals. The above recitals are true and correct and are incorporated herein. <br />2. Amendment of Section 5 Compensation. The first sentence of Section 5 — Compensation <br />is amended to read as follows: <br />"The COUNTY shall pay to Consultant the mutually agreed professional fee of $29, 139.00 <br />for the work performed under this Third Amendment, bringing the total payment to <br />consultant of FOUR HUNDRED NINETY-SEVEN THOUSAND ONE HUNDRED <br />Page 1 of 2 <br />47 <br />
The URL can be used to link to this page
Your browser does not support the video tag.