My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/02/2019
CBCC
>
Meetings
>
2010's
>
2019
>
07/02/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2019 1:32:09 PM
Creation date
9/11/2019 11:32:29 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
07/02/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Activity 19: Signing and Pavement Marking Analysis <br />Estimator: <br />Bowman - Indian River County 58th Ave Plan Revisions <br />4371 <br />Representing <br />Print Name <br />Signature / Date <br />FDOT District <br />Consultant Name <br />NOTE: Signature Block is optional, per District preference <br />Task <br />No. <br />Task <br />Units <br />No. of <br />Units <br />Hours/ <br />Units <br />Total <br />Hours <br />Comments <br />19.1 <br />Traffic Data Analysis <br />LS <br />1 <br />0 <br />0 <br />19.2 <br />No Passing Zone Study <br />LS <br />1 <br />0 <br />0 <br />19.3 <br />Reference and Master Design File <br />LS <br />1 <br />28 <br />28 <br />Re -reference cadd tiles and update design file (38 sheets) to reflect revisions requested in Mar -19 memo from IRC and <br />associated markups received on May 14, 2019 from the IRC Traffic Engineer and the addition of left turn lanes at the <br />Fairgrounds from 546+82 to 563+65 as reauested on Mav 24. 2019 by the IRC Proiect Manager. <br />19.4 <br />Multi -Post Sign Support Calculations <br />EA <br />1 <br />0 <br />0 <br />19.5 <br />Sign Panel Design Analysis <br />EA <br />1 <br />0 <br />0 <br />19.6 <br />Sign Lighting/Electrical Calculations <br />EA <br />1 <br />0 <br />0 <br />19.7 <br />Quantities <br />LS <br />1 <br />10 <br />10 <br />38 X 0.26 = 10 <br />• 19.8 <br />Cost Estimate <br />LS <br />1 <br />0 <br />0 <br />19 9 <br />Technical Special Provisions and Modified Special <br />Provisions <br />LS <br />1 <br />0 <br />0 <br />19.10 <br />Other Signing and Pavement Marking <br />LS <br />1 <br />0 <br />0 <br />Signing and Pavement Marking Analysis Technical Subtotal <br />38 <br />19.11 <br />Field Reviews <br />LS <br />1 <br />0 <br />0 <br />19.12 <br />Technical Meetings <br />LS <br />1 <br />0 <br />0 <br />Meetings are listed below <br />19.13 <br />Quality Assurance/Quality Control <br />LS <br />% <br />5% <br />2 <br />19.14 <br />Independent Peer Review <br />LS <br />% <br />0% <br />0 <br />19.15 <br />Supervision <br />LS <br />% <br />5% <br />2 <br />Signing and Pavement Marking Analysis Nontechnical Subtotal <br />4 <br />19.16 <br />Coordination <br />LS <br />% <br />5% <br />2 <br />19. Signing and Pavement Marking Analysis Total <br />44 <br />4371.00_6-01-19 IRC 58th Ave Plan Revisions fee Revised <br />19. Signing & Marking Analysis <br />Page 4 of 6 <br />6/1/2019 59 <br />
The URL can be used to link to this page
Your browser does not support the video tag.