Laserfiche WebLink
Consultant will review submitted contractor bids and prepare a written award <br />recommendation to IRCU. <br />ASSUMPTIONS <br />• Since this work is a direct replacement, permits from FDEP are not <br />anticipated. <br />• Contractor(s) will obtain any necessary Maintenance of Traffic (MOT). <br />• Road reconstruction will be limited to the area of full sewer pipe <br />replacement. <br />• Consultant can work on tasks 2 and 3 concurrently. <br />ADDITIONAL SERVICES <br />Any services not specifically provided for in the above scope will be billed as <br />Additional Services and performed at then -current hourly rates. Additional services <br />we can provide include but are not limited to construction phase services. <br />SCHEDULE <br />In general, the following schedule is anticipated from Notice to Proceed (NTP): <br />Task 1 PHASE 2 SSES <br />Task 2 PIPE LINING AND LATERAL REHABILITATION <br />Task 3 FULL SEWER PIPE REPLACEMENT <br />FEE SCHEDULE <br />4 - 8 weeks <br />8 -10 weeks <br />4 - 6 months <br />We will provide these services in accordance with our Continuing Services Contract <br />Agreement for Professional Services dated April 17th, 2018, with Indian River <br />County. <br />The Consultant will provide professional services for Tasks 1 and 2 on a lump sum <br />fee basis as follows: <br />Task No. <br />Task <br />Task Fee <br />TASK 1 <br />PHASE 2 SSES <br />$11,889 <br />TASK 2 <br />PIPE LINING AND LATERAL REHABILITATION <br />$15,889 <br />TASK 3 <br />FULL SEWER PIPE REPLACEMENT <br />$52,441 <br />TOTAL <br />$80,219 <br />F:\Utilities\UTILITY - Engineering\Projects - Capital Projects\19-0607 Ixora Park\Admin\Ixora Rehab Scope.docx Page 4 of 4 <br />