2019-161A
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-161A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 2:29:41 PM
Creation date
10/8/2019 9:38:00 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
09/17/2019
Control Number
2019-161A
Agenda Item Number
12.F.2.
Entity Name
Rio-Bak Corp.
Subject
Project award for Sector 5 Beach and Dune restoration project Bid No. 2019066
Bid Number
2019066
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14.07 of the General Conditions on or before the 210 calendar day after the date when the <br />Contract Times commence to run. <br />4.03 Liquidated Damages <br />A. CONTRACTOR and OWNER recognize that time is of the essence of this Agreement and <br />that OWNER will suffer financial loss if the Work is not completed within the times <br />specified in paragraph 4.02 above, plus any extensions thereof allowed in accordance with <br />Article 12 of the General Conditions. Liquidated damages will commence for this portion of <br />work. The parties also recognize the delays, expense, and difficulties involved in proving in <br />a legal proceeding the actual loss suffered by OWNER if the Work is not completed on <br />time. Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR <br />agree that as liquidated damages for delay (but not as a penalty), CONTRACTOR shall <br />pay OWNER $2,712 for each calendar day that expires after the time specified in <br />paragraph 4.02 for Substantial Completion until the Work is substantially complete. After <br />Substantial Completion, if CONTRACTOR shall neglect, refuse, or fail to complete the <br />remaining Work within the Contract lime or any proper extension thereof granted by <br />OWNER, CONTRACTOR shall pay OWNER $2,712 for each calendar day that expires <br />after the time specified in paragraph 4.02 for completion and readiness for final payment <br />until the Work is completed and ready for final payment. <br />ARTICLE 5 - CONTRACT PRICE <br />5.01 OWNER shall pay CONTRACTOR for completion of the Work in accordance with the <br />Contract Documents, an amount in current funds equal to the sum of the amounts <br />determined pursuant to paragraph 5.01.A and summarized in paragraph 5.01.B, below: <br />A. For all Work, at the prices stated in CONTRACTOR's Bid, attached hereto as an exhibit. <br />B. THE CONTRACT SUM subject to additions and deductions provided in the Contract: <br />Numerical Amount: $ 4,511,712.00 <br />Written Amount: FOUR MILLION FIVE HUNDRED ELEVEN THOUSAND SEVEN <br />HUNDRED TWELEVE DOLLARS AND ZERO CENTS <br />ARTICLE 6 - PAYMENT PROCEDURES <br />6.01 Submittal and Processing of Payments <br />A. CONTRACTOR shall submit Applications for Payment in accordance with Article 14 <br />of the General Conditions. Applications for Payment will be processed by <br />ENGINEER as provided in the General Conditions and the Contract Documents. <br />6.02 Progress Payments. <br />A. The OWNER shall make progress payments to the CONTRACTOR on the basis of <br />the approved partial payment request as recommended by ENGINEER in <br />accordance with the provisions of the Local Government Prompt Payment Act, <br />Florida Statutes section 218.70 et. seq. The OWNER shall retain ten percent <br />(10%) of the payment amounts due to the CONTRACTOR until fifty percent <br />(50%) completion of the work. After fifty percent (50%) completion of the work is <br />attained as certified to OWNER by ENGINEER in writing, OWNER shall retain <br />five percent (5%) of the payment amount due to CONTRACTOR until final <br />00520_Contract_RioBak_2019_Sector5. d oc <br />00520 - 3 <br />F:\Purchasing\Bids\2018-2019 FY (2019000)\2019066 Sector 5 Beach and Dune Renourishment\00520_Contract_RioBak_2019_Sector5.doc <br />