ARTICLE 8 - CONTRACTOR'S REPRESENTATIONS
<br />8.01 In order to induce OWNER to enter into this Agreement CONTRACTOR makes the
<br />following representations:
<br />A. CONTRACTOR has examined and carefully studied the Contract Documents and the
<br />other related data identified in the Bidding Documents.
<br />B. CONTRACTOR has visited the Site and become familiar with and is satisfied as to the
<br />general, local, and Site conditions that may affect cost, progress, and performance of the
<br />Work.
<br />C. CONTRACTOR is familiar with and is satisfied as to all federal, state, and local Laws and
<br />Regulations that may affect cost, progress, and performance of the Work.
<br />D. CONTRACTOR has carefully studied all: (1) reports of explorations and tests of
<br />subsurface conditions at or contiguous to the Site and all drawings of physical conditions
<br />in or relating to existing surface or subsurface structures at or contiguous to the Site
<br />(except Underground Facilities) which have been identified in the Supplementary
<br />Conditions as provided in paragraph 4.02 of the General Conditions and (2) reports and
<br />drawings of a Hazardous Environmental Condition, if any, at the Site which have been
<br />identified in the Supplementary Conditions as provided in paragraph 4.06 of the General
<br />Conditions.
<br />E. CONTRACTOR has obtained and carefully studied (or assumes responsibility for having
<br />done so) all additional or supplementary examinations, investigations, explorations, tests,
<br />studies, and data concerning conditions (surface, subsurface, and Underground Facilities)
<br />at or contiguous to the Site which may affect cost, progress, or performance of the Work
<br />or which relate to any aspect of the means, methods, techniques, sequences, and
<br />procedures of construction to be employed by CONTRACTOR, including applying the
<br />specific means, methods, techniques, sequences, and procedures of construction, if any,
<br />expressly required by the Contract Documents to be employed by CONTRACTOR, and
<br />safety precautions and programs incident thereto
<br />F. CONTRACTOR does not consider that any further examinations, investigations,
<br />explorations, tests, studies, or data are necessary for the performance of the Work at the
<br />Contract Price, within the Contract Times, and in accordance with the other terms and
<br />conditions of the Contract Documents.
<br />G. CONTRACTOR is aware of the general nature of work to be performed by OWNER and
<br />others at the Site that relates to the Work as indicated in the Contract Documents.
<br />H. CONTRACTOR has correlated the information known to CONTRACTOR, information and
<br />observations obtained from visits to the Site, reports and drawings identified in the
<br />Contract Documents, and all additional examinations, investigations, explorations, tests,
<br />studies, and data with the Contract Documents.
<br />I. CONTRACTOR has given ENGINEER written notice of all conflicts, errors, ambiguities, or
<br />discrepancies that CONTRACTOR has discovered in the Contract Documents, and
<br />the written resolution thereof by ENGINEER is acceptable to CONTRACTOR.
<br />J. The Contract Documents are generally sufficient to indicate and convey understanding of
<br />all terms and conditions for performance and furnishing of the Work.
<br />00520 Contract RioBak 2019 Sector5.doc
<br />00520 - 5
<br />F'\Purchasing\Bids\2018-2019 FY (2019000)\2019066 Sector 5 Beach and Dune Renourishment\00520_Contract_RioBak_2019_Sector5.doc
<br />
|