Laserfiche WebLink
ARTICLE 8 - CONTRACTOR'S REPRESENTATIONS <br />8.01 In order to induce OWNER to enter into this Agreement CONTRACTOR makes the <br />following representations: <br />A. CONTRACTOR has examined and carefully studied the Contract Documents and the <br />other related data identified in the Bidding Documents. <br />B. CONTRACTOR has visited the Site and become familiar with and is satisfied as to the <br />general, local, and Site conditions that may affect cost, progress, and performance of the <br />Work. <br />C. CONTRACTOR is familiar with and is satisfied as to all federal, state, and local Laws and <br />Regulations that may affect cost, progress, and performance of the Work. <br />D. CONTRACTOR has carefully studied all: (1) reports of explorations and tests of <br />subsurface conditions at or contiguous to the Site and all drawings of physical conditions <br />in or relating to existing surface or subsurface structures at or contiguous to the Site <br />(except Underground Facilities) which have been identified in the Supplementary <br />Conditions as provided in paragraph 4.02 of the General Conditions and (2) reports and <br />drawings of a Hazardous Environmental Condition, if any, at the Site which have been <br />identified in the Supplementary Conditions as provided in paragraph 4.06 of the General <br />Conditions. <br />E. CONTRACTOR has obtained and carefully studied (or assumes responsibility for having <br />done so) all additional or supplementary examinations, investigations, explorations, tests, <br />studies, and data concerning conditions (surface, subsurface, and Underground Facilities) <br />at or contiguous to the Site which may affect cost, progress, or performance of the Work <br />or which relate to any aspect of the means, methods, techniques, sequences, and <br />procedures of construction to be employed by CONTRACTOR, including applying the <br />specific means, methods, techniques, sequences, and procedures of construction, if any, <br />expressly required by the Contract Documents to be employed by CONTRACTOR, and <br />safety precautions and programs incident thereto <br />F. CONTRACTOR does not consider that any further examinations, investigations, <br />explorations, tests, studies, or data are necessary for the performance of the Work at the <br />Contract Price, within the Contract Times, and in accordance with the other terms and <br />conditions of the Contract Documents. <br />G. CONTRACTOR is aware of the general nature of work to be performed by OWNER and <br />others at the Site that relates to the Work as indicated in the Contract Documents. <br />H. CONTRACTOR has correlated the information known to CONTRACTOR, information and <br />observations obtained from visits to the Site, reports and drawings identified in the <br />Contract Documents, and all additional examinations, investigations, explorations, tests, <br />studies, and data with the Contract Documents. <br />I. CONTRACTOR has given ENGINEER written notice of all conflicts, errors, ambiguities, or <br />discrepancies that CONTRACTOR has discovered in the Contract Documents, and <br />the written resolution thereof by ENGINEER is acceptable to CONTRACTOR. <br />J. The Contract Documents are generally sufficient to indicate and convey understanding of <br />all terms and conditions for performance and furnishing of the Work. <br />00520 Contract RioBak 2019 Sector5.doc <br />00520 - 5 <br />F'\Purchasing\Bids\2018-2019 FY (2019000)\2019066 Sector 5 Beach and Dune Renourishment\00520_Contract_RioBak_2019_Sector5.doc <br />