My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-162A
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-162A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2019 3:24:35 PM
Creation date
10/16/2019 2:45:11 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
10/01/2019
Control Number
2019-162A
Agenda Item Number
8.K.
Entity Name
Sunshine Land Design Inc. and Indian River County
Subject
Project Award for Bid NO. 20190716 Indian River Boulevard and Grand Harbor Boulevard Signalization
Bid Number
20190716
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 of 5 <br />CERTIFICATION OF ENGINEER: <br />I certify that I have reviewed the above and foregoing Periodic Estimate for Partial <br />Payment; that to the best of my knowledge and belief it appears to be a reasonably <br />accurate statement of the work performed and/or material supplied by the Contractor. I am <br />not certifying as to whether or not the Contractor has paid all subcontractors, laborers, <br />materialmen and suppliers because I am not in a position to accurately determine that issue. <br />Dated <br />SIGNATURE <br />CERTIFICATION OF INSPECTOR: <br />I have checked the estimate against the Contractor's Schedule of Amounts for Contract <br />Payments and the notes and reports of my inspections of the project. To the best of my <br />knowledge, this statement of work performed and/or materials supplied appears to be <br />reasonably accurate, that the Contractor appears to be observing the requirements of the <br />Contract with respect to construction, and that the Contractor should be paid the amount <br />requested above, unless otherwise noted by me. 1 am not certifying as to whether or not the <br />Contractor has paid all subcontractors, laborers, materialmen and suppliers because I am <br />not in a position to accurately determine that issue. <br />Dated <br />SIGNATURE <br />[The Remainder of This Page Was Left Blank Intentionally] <br />Page 5 of 5 <br />00622 - Contractor's Application for Payment - 03-10 rev <br />00622-4 <br />F:\PublicWoFks\ENGINEERING DIVISION PROJECTS\1806 Indian River Blvd and Grand Harbor Blvd -Mast Arms\1-Admin\Bid Documents\Master Contract Documents Re-Bid\00622 <br />- Contractors Application for Payment - 03-10 rev.doc Rev. 05/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.