My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-162A
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-162A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2019 3:24:35 PM
Creation date
10/16/2019 2:45:11 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
10/01/2019
Control Number
2019-162A
Agenda Item Number
8.K.
Entity Name
Sunshine Land Design Inc. and Indian River County
Subject
Project Award for Bid NO. 20190716 Indian River Boulevard and Grand Harbor Boulevard Signalization
Bid Number
20190716
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00630 - Certificate of Substantial Completion <br />Date of Issuance: 20 <br />OWNER: Indian River County <br />CONTRACTOR - <br />CONTRACT FOR: INDIAN RIVER BOULEVARD AND GRAND HARBOR BOULEVARD <br />SIGNALIZATION <br />Project No.: IRC -1806 <br />Project Description: The proposed improvements to the intersection of Indian River <br />Boulevard and Grand Harbor Boulevard consist of the signalization of the intersection by <br />installing mast arm assemblies which will be provided by the County, with all other <br />appurtenances to be furnished by the Contractor. Also included is milling and <br />resurfacing, curb ramp upgrades, signing and pavement markings, and sodding. <br />OWNER's Bid No. 2019076 <br />This Certificate of Substantial Completion applies to all Work under the Contract Documents or <br />to the following specified parts thereof: <br />To, <br />OWNER <br />And T <br />CONTRACTOR <br />The Work to which this Certificate applies has been inspected by authorized representatives of <br />OWNER, CONTRACTOR and ENGINEER, and that Work is hereby declared to be substantially <br />complete in accordance with the Contract Documents on <br />DATE OF SUBSTANTIAL COMPLETION <br />A tentative list of items to be completed or corrected is attached hereto. This list may not be all- <br />inclusive, and the failure to include an item in it does not alter the responsibility of <br />CONTRACTOR to complete all the Work in accordance with the Contract Documents. The <br />items in the tentative list shall be completed or corrected by CONTRACTOR within <br />calendar days of the above date of Substantial Completion. <br />The responsibilities between OWNER and CONTRACTOR for security, operation, safety, <br />00630 - Certificate of Substantial Completion REV 04-07 <br />00630-1 <br />F:\PublicWorks\ENGINEERING DIVISION PROJECTS\1806 Indian River Blvd and Grand Harbor Blvd -Mast Arms\1-Admin\Bid DocumentsWaster Contract Documents Re- <br />Bid\00630 - Certificate of Substantial Completion REV 04-07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.