My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-162A
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-162A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2019 3:24:35 PM
Creation date
10/16/2019 2:45:11 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
10/01/2019
Control Number
2019-162A
Agenda Item Number
8.K.
Entity Name
Sunshine Land Design Inc. and Indian River County
Subject
Project Award for Bid NO. 20190716 Indian River Boulevard and Grand Harbor Boulevard Signalization
Bid Number
20190716
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE OF CONTENTS <br />Title Page <br />ARTICLE 1 - DEFINITIONS AND TERMINOLOGY.....................................................................................................5 <br />1.01 Defined Terms...................................................................................................................................5 <br />1.02 Terminology.......................................................................................................................................7 <br />ARTICLE 2 - PRELIMINARY MATTERS......................................................................................................................8 <br />2.01 Delivery of Bonds..............................................................................................................................8 <br />2.02 Copies of Documents........................................................................................................................8 <br />2.03 Commencement of Contract Times, Notice to Proceed...................................................................8 <br />2.04 Starting the Work...............................................................................................................................8 <br />2.05 Before Starting Construction.............................................................................................................9 <br />2.06 Preconstruction Conference.............................................................................................................9 <br />2.07 Initial Acceptance of Schedules........................................................................................................9 <br />ARTICLE 3 - CONTRACT DOCUMENTS: INTENT, AMENDING, REUSE................................................................10 <br />3.01 Intent..................................................................................................................................................10 <br />3.02 Reference Standards........................................................................................................................10 <br />3.03 Reporting and Resolving Discrepancies...........................................................................................10 <br />3.04 Amending and Supplementing Contract Documents.......................................................................10 <br />3.05 Reuse of Documents.........................................................................................................................11 <br />ARTICLE 4 - AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS; REFERENCE <br />POINTS.....................................................................................................................................................11 <br />4.01 Availability of Lands...........................................................................................................................11 <br />4.02 Subsurface and Physical Conditions................................................................................................11 <br />4.03 Differing Subsurface or Physical Conditions.....................................................................................12 <br />4.04 Underground Facilities......................................................................................................................12 <br />4.05 Reference Points...............................................................................................................................13 <br />4.06 Hazardous Environmental Condition at Site.....................................................................................13 <br />ARTICLE 5 - BONDS AND INSURANCE.....................................................................................................................15 <br />5.01 Performance, Payment, and Other Bonds........................................................................................15 <br />5.02 Licensed Sureties and Insurers........................................................................................................15 <br />5.03 Certificates of Insurance...................................................................................................................15 <br />5.04 CONTRACTOR's Liability Insurance................................................................................................15 <br />5.05 OWNER's Liability Insurance............................................................................................................16 <br />5.06 Property Insurance............................................................................................................................16 <br />5.07 Waiver of Rights................................................................................................................................17 <br />5.08 Receipt and Application of Insurance Proceeds...............................................................................18 <br />5.09 Acceptance of Bonds and Insurance, Option to Replace.................................................................18 <br />5.10 Partial Utilization, Acknowledgment of Property Insurer...................................................................18 <br />ARTICLE 6 - CONTRACTOR'S RESPONSIBILITIES.................................................................................................18 <br />6.01 Supervision and Superintendence....................................................................................................18 <br />6.02 Labor, Working Hours.......................................................................................................................19 <br />6.03 Services, Materials, and Equipment.................................................................................................19 <br />6.04 Progress Schedule............................................................................................................................19 <br />6.05 Substitutes and "Or-Equals"..............................................................................................................19 <br />6.06 Conceming Subcontractors, Suppliers, and Others........................................................................21 <br />00700 - General Conditions REV 5-10-13 <br />00700-2 <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\1806 Indian River Blvd and Grand Harbor Blvd -Mast Arms\I-Admin\Bid Documents\Master Contract Documents\00700 -General Conditions REV <br />5-10-13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.