My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-162A
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-162A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2019 3:24:35 PM
Creation date
10/16/2019 2:45:11 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
10/01/2019
Control Number
2019-162A
Agenda Item Number
8.K.
Entity Name
Sunshine Land Design Inc. and Indian River County
Subject
Project Award for Bid NO. 20190716 Indian River Boulevard and Grand Harbor Boulevard Signalization
Bid Number
20190716
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.03 Differing Subsurface or Physical Conditions b. with respect to Work that is paid for <br />on a Unit Price Basis, any adjustment in <br />A. Notice: If CONTRACTOR believes that any Contract Price will be subject to the <br />subsurface or physical condition at or contiguous to provisions of paragraphs 9.08 and 11.03. <br />the Site that is uncovered or revealed either: <br />1. is of such a nature as to establish <br />that any "technical data" on which CONTRAC- <br />TOR is entitled to rely as provided in paragraph <br />4.02 is materially inaccurate; or <br />2. is of such a nature as to require a <br />change in the Contract Documents; or <br />3. differs materially from that shown or <br />indicated in the Contract Documents; or <br />4. is of an unusual nature, and differs <br />materially from conditions ordinarily <br />encountered and generally recognized as inher- <br />ent in work of the character provided for in the <br />Contract Documents; <br />then CONTRACTOR shall, promptly after becoming <br />aware thereof and before further disturbing the <br />subsurface or physical conditions or performing any <br />Work in connection therewith (except in an emergency <br />as required by paragraph 6.16.A), notify OWNER and <br />ENGINEER in writing about such condition. <br />CONTRACTOR shall not further disturb such <br />condition or perform any Work in connection therewith <br />(except as aforesaid) until receipt of written order to do <br />so. <br />B. ENGINEER's Review: After receipt of written <br />notice as required by paragraph 4.03.A, ENGINEER <br />will promptly review the pertinent condition, determine <br />the necessity of OWNER's obtaining additional <br />exploration or tests with respect thereto, and advise <br />OWNER in writing (with a copy to CONTRACTOR) of <br />ENGINEER's findings and conclusions. <br />C. Possible Price and Times Adjustments <br />1. The Contract Price or the Contract <br />Times, or both, will be equitably adjusted to the <br />extent that the existence of such differing <br />subsurface or physical condition causes an in- <br />crease or decrease in CONTRACTOR's cost <br />of, or time required for, performance of the <br />Work; subject, however, to the following: <br />a. such condition must meet any one or <br />more of the categories described in para- <br />graph 4.03.A; and <br />2. CONTRACTOR shall not be entitled <br />to any adjustment in the Contract Price or <br />Contract Times if: <br />a. CONTRACTOR knew of the <br />existence of such conditions at the time <br />CONTRACTOR made a final commitment <br />to OWNER in respect of Contract Price and <br />Contract Times by the submission of a Bid <br />or becoming bound under a negotiated <br />contract; or <br />b. the existence of such condition could <br />reasonably have been discovered or <br />revealed as a result of any examination, <br />investigation, exploration, test, or study of <br />the Site and contiguous areas required by <br />the Bidding Requirements or Contract <br />Documents to be conducted by or for CON- <br />TRACTOR prior to CONTRACTOR's <br />making such final commitment; or <br />c. CONTRACTOR failed to give the <br />written notice within the time and as re- <br />quired by paragraph 4.03.A. <br />3. If OWNER and CONTRACTOR are <br />unable to agree on entitlement to or on the <br />amount or extent, if any, of any adjustment in <br />the Contract Price or Contract Times, or both, a <br />Claim may be made therefor as provided in <br />paragraph 10.05. However, OWNER, <br />ENGINEER, and ENGINEER's Consultants <br />shall not be liable to CONTRACTOR for any <br />claims, costs, losses, or damages (including <br />but not limited to all fees and charges of <br />engineers, architects, attorneys, and other <br />professionals and all court or arbitration or other <br />dispute resolution costs) sustained by <br />CONTRACTOR on or in connection with any <br />other project or anticipated project. <br />4.04 Underground Facilities <br />A. Shown or Indicated. The information and data <br />shown or indicated in the Contract Documents with <br />respect to existing Underground Facilities at or <br />contiguous to the Site is based on information and <br />data furnished to OWNER or ENGINEER by the <br />owners of such Underground Facilities, including <br />OWNER, or by others. Unless it is otherwise <br />expressly provided in the Supplementary Conditions: <br />00700 - General Conditions REV 5-10-13 <br />00700-12 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1806 Indian River Blvd and Grand Harbor Blvd - Mast Arms\1-Admin\Bid Documents\Master Contract Documents\00700 - General <br />Conditions REV 5-10-13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.