My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-162A
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-162A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2019 3:24:35 PM
Creation date
10/16/2019 2:45:11 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
10/01/2019
Control Number
2019-162A
Agenda Item Number
8.K.
Entity Name
Sunshine Land Design Inc. and Indian River County
Subject
Project Award for Bid NO. 20190716 Indian River Boulevard and Grand Harbor Boulevard Signalization
Bid Number
20190716
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The procedure for review by ENGINEER will be similar <br />to that provided in subparagraph 6.05.A.2. <br />C. Engineer's Evaluation: ENGINEER will be <br />allowed a reasonable time within which to evaluate <br />each proposal or submittal made pursuant to para- <br />graphs 6.05.A and 6.05.6. ENGINEER will be the <br />sole judge of acceptability. No "or -equal" or substitute <br />will be ordered, installed or utilized until ENGINEER's <br />review is complete, which will be evidenced by either a <br />Change Order for a substitute or an approved Shop <br />Drawing for an "or equal." ENGINEER will advise <br />CONTRACTOR in writing of any negative <br />determination. <br />D. Special Guarantee: OWNER may require <br />CONTRACTOR to furnish at CONTRACTOR's ex- <br />pense a special performance guarantee or other <br />surety with respect to any substitute. <br />E. ENGINEER's Cost Reimbursement: <br />ENGINEER will record time required by ENGINEER <br />and ENGINEER's Consultants in evaluating substitute <br />proposed or submitted by CONTRACTOR pursuant to <br />paragraphs 6.05.A.2 and 6.05.13 and in making <br />changes in the Contract Documents (or in the <br />provisions of any other direct contract with OWNER <br />for work on the Project) occasioned thereby. Whether <br />or not ENGINEER approves a substitute item so pro- <br />posed or submitted by CONTRACTOR, CON- <br />TRACTOR shall reimburse OWNER for the charges <br />of ENGINEER and ENGINEER's Consultants for <br />evaluating each such proposed substitute. <br />F. CONTRACTOR's Expense: CONTRACTOR <br />shall provide all data in support of any proposed <br />substitute or "or -equal" at CONTRACTOR's expense. <br />6.06 Concerning Subcontractors, Suppliers, <br />and Others <br />A. CONTRACTOR shall not employ any <br />Subcontractor, Supplier, or other individual or entity <br />(including those acceptable to OWNER as indicated in <br />paragraph 6.06.6), whether initially or as a <br />replacement, against whom OWNER may have <br />reasonable objection. CONTRACTOR shall not be <br />required to employ any Subcontractor, Supplier, or <br />other individual or entity to furnish or perform any of <br />the Work against whom CONTRACTOR has reason- <br />able objection. <br />B. If the Supplementary Conditions require the <br />identity of certain Subcontractors, Suppliers, or other <br />individuals or entities to be submitted to OWNER in <br />advance for acceptance by OWNER by a specified <br />date prior to the Effective Date of the Agreement, and <br />if CONTRACTOR has submitted a list thereof in <br />accordance with the Supplementary Conditions, <br />OWNER's acceptance (either in writing or by failing to <br />make written objection thereto by the date indicated <br />for acceptance or objection in the Bidding Documents <br />or the Contract Documents) of any such Subcon- <br />tractor, Supplier, or other individual or entity so <br />identified may be revoked on the basis of reasonable <br />objection after due investigation. CONTRACTOR <br />shall submit an acceptable replacement for the <br />rejected Subcontractor, Supplier, or other individual or <br />entity, and the Contract Price will be adjusted by the <br />difference in the cost occasioned by such <br />replacement, and an appropriate Change Order will be <br />issued or Written Amendment signed. No acceptance <br />by OWNER of any such Subcontractor, Supplier, or <br />other individual or entity, whether initially or as a <br />replacement, shall constitute a waiver of any right of <br />OWNER or ENGINEER to reject defective Work. <br />C. CONTRACTOR shall be fully responsible to <br />OWNER and ENGINEER for all acts and omissions of <br />the Subcontractors, Suppliers, and other individuals or <br />entities performing or furnishing any of the Work just <br />as CONTRACTOR is responsible for <br />CONTRACTOR's own acts and omissions. Nothing in <br />the Contract Documents shall create for the benefit of <br />any such Subcontractor, Supplier, or other individual <br />or entity any contractual relationship between OWNER <br />or ENGINEER and any such Subcontractor, Supplier <br />or other individual or entity, nor shall it create any <br />obligation on the part of OWNER or ENGINEER to <br />pay or to see to the payment of any moneys due any <br />such Subcontractor, Supplier, or other individual or <br />entity except as may otherwise be required by Laws <br />and Regulations. <br />D. CONTRACTOR shall be solely responsible <br />for scheduling and coordinating the Work of Subcon- <br />tractors, Suppliers, and other individuals or entities <br />performing or furnishing any of the Work under a <br />direct or indirect contract with CONTRACTOR. <br />E. CONTRACTOR shall require all Subcontrac- <br />tors, Suppliers, and such other individuals or entities <br />performing or furnishing any of the Work to commu- <br />nicate with ENGINEER through CONTRACTOR. <br />F. The divisions and sections of the Specifica- <br />tions and the identifications of any Drawings shall not <br />control CONTRACTOR in dividing the Work among <br />Subcontractors or Suppliers or delineating the Work to <br />be performed by any specific trade. <br />G. All Work performed for CONTRACTOR by a <br />Subcontractor or Supplier will be pursuant to an <br />appropriate agreement between CONTRACTOR and <br />00700 - General Conditions REV 5-10-13 <br />00700-21 <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\1806 Indian River Blvd and Grand Harbor Blvd - Mast Anns\1-Admin\Bid Documents\Master Contract Documents\00700 - General <br />Conditions REV 5-10-13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.