My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-147
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-147
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 2:21:56 PM
Creation date
10/17/2019 11:43:44 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/10/2019
Control Number
2019-147
Agenda Item Number
8.X.
Entity Name
Guettler Brothers Construction,
Subject
49th Street Milling and Resurfacing, 58th Avenue to 31st Avenue
FM NO. 436850-1-54-01
Project Number
IRC-1414
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00630 - Certificate of Substantial Completion <br />Date of Issuance: , 20 <br />OWNER: Indian River County <br />CONTRACTOR - <br />CONTRACT FOR: 49TH STREET MILLING AND RESURFACING (58TH AVENUE TO <br />31ST AVENUE) <br />Project No.: IRC -1414 <br />Project Description: This project will be performed to resurface 49th Street from 58th <br />Avenue to 31St Avenue. The proposed improvements include milling of existing <br />pavement, installation of superpave asphaltic concrete, curb and gutter, guardrail <br />upgrades, sodding and installation of thermoplastic pavement markings. This project is <br />an F.D.O.T. Small County Outreach Program (SCOP) funded project, FM No. 436850-1-54- <br />01. <br />OWNER's Bid No. 2019010 <br />This Certificate of Substantial Completion applies to all Work under the Contract Documents or <br />to the following specified parts thereof: <br />To - <br />OWNER <br />And To - <br />CONTRACTOR <br />The Work to which this Certificate applies has been inspected by authorized representatives of <br />OWNER, CONTRACTOR and ENGINEER, and that Work is hereby declared to be <br />substantially complete in accordance with the Contract Documents on <br />DATE OF SUBSTANTIAL COMPLETION <br />A tentative list of items to be completed or corrected is attached hereto. This list may not be all- <br />inclusive, and the failure to include an item in it does not alter the responsibility of <br />CONTRACTOR to complete all the Work in accordance with the Contract Documents. The <br />items in the tentative list shall be completed or corrected by CONTRACTOR within 30 calendar <br />days of the above date of Substantial Completion. <br />00630 - Certificate of Substantial Completion REV 04-07 <br />00630 1 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS 11414 -49th St_58th Ave to 31st Ave\1-Admin\Bids\Bid Documents'Master Contract Documents100630 - Certificate of <br />Substantial Completion REV 04-07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.