My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-147
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-147
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 2:21:56 PM
Creation date
10/17/2019 11:43:44 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/10/2019
Control Number
2019-147
Agenda Item Number
8.X.
Entity Name
Guettler Brothers Construction,
Subject
49th Street Milling and Resurfacing, 58th Avenue to 31st Avenue
FM NO. 436850-1-54-01
Project Number
IRC-1414
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01340 <br />SUBMITTAL OF SHOP DRAWINGS <br />E. All submittals shall bear the stamp of approval and signature of <br />CONTRACTOR as evidence that they have been reviewed by <br />CONTRACTOR. Submittals without this stamp of approval will not be <br />reviewed by the ENGINEER and will be returned to CONTRACTOR. <br />F. Assign a number to each submittal starting with No. 1 and thence <br />numbered consecutively. Identify resubmittals by the original submittal <br />number followed by the suffix "A" for the first resubmittal, the suffix "B" for <br />the second resubmittal, etc. <br />G. Initially submit to ENGINEER a minimum of two (2) copies of all submittals <br />that are on 11 -inch by 17 -inch or smaller sheets (no less than 8 1/2 -inch x <br />11 -inch). <br />H. After ENGINEER completes his review, Shop Drawings will be marked <br />with one of the following notations: <br />1. Approved <br />2. Approved as Noted <br />3. NOT Approved - Resubmit <br />I. If a submittal is acceptable, it will be marked "Approved" or "Approved as <br />Noted". One (1) electronic copy of the submittal will be returned to <br />CONTRACTOR. <br />J. Upon return of a submittal marked "Approved" or "Approved as Noted", <br />CONTRACTOR may order, ship or fabricate the materials included on the <br />submittal, provided it is in accordance with the corrections indicated. <br />K. If a submittal is unacceptable, one (1) copy will be returned to <br />CONTRACTOR with following notation, "NOT Approved - Resubmit". <br />L. Upon return of a submittal marked "NOT Approved - Resubmit", make the <br />corrections indicated and repeat the initial approval procedure. Upon <br />return of a submittal so marked, repeat the initial approval procedure <br />utilizing acceptable material or equipment. <br />M. Work shall not be performed nor equipment installed with an ENGINEER <br />"Approved" or "Approved as Noted" Shop Drawing. <br />N. Submit Shop Drawings well in advance of the need for the material or <br />equipment for construction and with ample allowance for the time required <br />to make delivery of material or equipment after data covering such is <br />approved. CONTRACTOR shall assume the risk for all materials or <br />equipment which is fabricated or delivered prior to the approval of Shop <br />Drawings. Materials or equipment requiring Shop Drawings which have <br />01340 - Submittal of Shop Drawings <br />01340-5 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS \1414 -49th St_58th Ave to 31stAve \1 -Admin \ Bids \Bid Documents\Master Contract <br />Documents \01340 - Submittal of Shop Drawings.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.