My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-147
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-147
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 2:21:56 PM
Creation date
10/17/2019 11:43:44 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/10/2019
Control Number
2019-147
Agenda Item Number
8.X.
Entity Name
Guettler Brothers Construction,
Subject
49th Street Milling and Resurfacing, 58th Avenue to 31st Avenue
FM NO. 436850-1-54-01
Project Number
IRC-1414
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01550 <br />ACCESS ROADS, PARKING AREAS <br />AND USE OF PUBLIC STREETS <br />1.1 GENERAL <br />A. Provide all temporary construction roads, walks and parking areas required <br />during construction and for use of emergency vehicles. Design and <br />maintain temporary roads and parking areas so they are fully usable in all <br />weather conditions. <br />B. Prevent interference with traffic and the OWNER's operations on existing <br />roads. Indemnify and save harmless the OWNER from any expenses <br />caused by CONTRACTOR's operations over these roads. <br />C. Roadways damaged by CONTRACTOR shall be restored to their original <br />condition by the CONTRACTOR subject to approval of the OWNER or <br />ENGINEER. <br />D. Remove temporary roads, walks and parking areas prior to final acceptance <br />and return the ground to its original condition, unless otherwise required by <br />the Contract Documents. <br />1.2 USE OF PUBLIC STREETS <br />The use of public streets and alleys shall be such as to provide a minimum of <br />inconvenience to the public and to other traffic. Any earth or other excavated <br />material spilled from trucks shall be removed immediately by the CONTRACTOR <br />and the streets cleaned to the satisfaction of the Owner. <br />1.3 USE OF PUBLIC STREETS FOR HAUL ROADS <br />A. Prior to construction, the CONTRACTOR shall designate all proposed haul <br />roads to be used during the life of the project, and submit the haul route at <br />the Pre -Construction meeting. Any earth or other materials spilled from <br />trucks shall be removed by the CONTRACTOR and streets cleaned to the <br />satisfaction of the Owner. He further shall be responsible for repairs to any <br />damages caused by his operations, prior to final payment. <br />B. All trucks carrying earth shall be covered while moving with an appropriate <br />tarpaulin. Should trucks hauling earth fail to cover their loads, the <br />CONTRACTOR will be given two (2) written warnings, after which the <br />CONTRACTOR shall pay a fine of $50 per uncovered truck to the Owner <br />when invoked by the Owner to Owner's Engineer. All cleanup shall be the <br />responsibility of the CONTRACTOR. <br />C. All trucks/moving equipment shall have backup warning horns in proper <br />working order while on the job site. <br />+ + END OF SECTION + + <br />01550 Access Roads <br />01550-1 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1414-49th St 58th Ave to 31st Ave\1-Admin \Bids \Bid Documents\Master Contract <br />Documents\01550 - Access Roads.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.