My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-147
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-147
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 2:21:56 PM
Creation date
10/17/2019 11:43:44 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/10/2019
Control Number
2019-147
Agenda Item Number
8.X.
Entity Name
Guettler Brothers Construction,
Subject
49th Street Milling and Resurfacing, 58th Avenue to 31st Avenue
FM NO. 436850-1-54-01
Project Number
IRC-1414
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ITEMIZED BID SCHEDULE <br />PROJECT NAME: 49TH STREET MILLING AND RESURFACING (58TH AVENUE TO 31ST AVENUE) <br />PROJECT NO. IRC1414 BID NO. 2019010 FM NO. 436850-1-54-01 <br />BIDDER'S NAME: <br />item No. <br />Description -- _ <br />UnitUnit <br />trice <br />Quantity_; <br />Tatai <br />711-11-141A <br />SKIP TRAFFIC STRIPE (6" WHITE 6'-10') THERMOPLASTIC <br />GM <br />0.044 <br />711-11-170 <br />TURN ARROWS, THERMOPLASTIC (WHITE) <br />EA <br />18 <br />711-11-224 <br />SOLID TRAFFIC STRIP (18" YELLOW) THERMOPLASTIC <br />LF <br />651 <br />711-11-241 <br />SKIP TRAFFIC STRIP (6" YELLOW 6-10') THERMOPLASTIC <br />GM <br />0.027 <br />711-16-101 <br />SOLID TRAFFIC STRIPE (6" WHITE) THERMOPLASTIC <br />GM <br />2.210 <br />711-16-201 <br />SOLID TRAFFIC STRIPE (6" YELLOW) THERMOPLASTIC <br />GM <br />3.114 <br />999-1 <br />RECORD DRAWINGS/AS-BUILTS <br />LS <br />1 <br />SUB TOTAL <br />999-25 <br />FORCE ACCOUNT <br />$90,000.00 <br />49TH STREET (58TH AVE -31ST AVE) RESURFACING PROJECT <br />LS = Lump Sum LF = Linear Foot EA = Each SY = Square Yard SF = Square Foot GM = Gross Mile <br />NOTE: IF THERE IS A DISCREPANCY BETWEEN THE PLANS (SUMMARY OF PAY ITEMS) AND THE ITEMIZED BID <br />SCHEDULE, THE BID SCHEDULE WILL BE UTILIZED FOR BIDDING PURPOSES. <br />TOTAL PROJECT BID AMOUNT IN WORDS <br />00310-4 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1414-49th St_58th Ave to 31st Ave\1-Admin\Bids\Bid Documents\IRC-1414_113S_20181002 <br />
The URL can be used to link to this page
Your browser does not support the video tag.