My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-147
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-147
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 2:21:56 PM
Creation date
10/17/2019 11:43:44 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/10/2019
Control Number
2019-147
Agenda Item Number
8.X.
Entity Name
Guettler Brothers Construction,
Subject
49th Street Milling and Resurfacing, 58th Avenue to 31st Avenue
FM NO. 436850-1-54-01
Project Number
IRC-1414
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Addendum #1 <br />SECTION - 102 - MAINTENANCE OF TRAFFIC <br />The work specified in this item shall conform to Section 102 of the Florida Department of <br />Transportation Standard Specifications for Road and Bridge Construction, except as <br />modified herein. <br />A. GENERAL PROVISIONS -DESCRIPTION: The work specified in this Section consists <br />of maintaining traffic within the limits of the project for the duration of the construction <br />period, including any temporary suspensions of the work. It shall include the <br />construction and maintenance of any necessary detour facilities; the providing of <br />necessary facilities for access to residences, businesses, etc., along the project; the <br />furnishing, installing and maintaining of traffic control and safety devices during <br />construction, the control of dust through the use of calcium chloride if necessary, and <br />any other special requirements for safe and expeditious movement of traffic as may <br />be called for on the plans. The term, Maintenance of Traffic, as used herein, shall <br />include all of such facilities, devices and operations as are required for the safety and <br />convenience of the public as well as for minimizing public nuisance; all as specified in <br />this Itemized Section 14 of these provisions and Paragraph 24 in General Conditions <br />Section. <br />B. BEGINNING DATE OF CONTRACTOR'S RESPONSIBILITY: The Contractor shall <br />present his Maintenance of Traffic Plan at the pre -construction conference. The <br />Maintenance of Traffic Plan shall indicate the type and location of all signs, lights, <br />barricades, striping and barriers to be used for the safe passage of pedestrians and <br />vehicular traffic through the project and for the protection of the workmen. The plan <br />will indicate conditions and setups for each phase of the Contractor's activities. <br />When the project plans include or specify a specific Maintenance of Traffic Plan, <br />alternate proposals will be considered when they are found to be equal to or better <br />than the plan specified. <br />In no case may the Contractor begin work until the Maintenance of Traffic Plan has <br />been approved in writing by the Engineer. Modifications to the Maintenance of Traffic <br />Plan that become necessary shall also be approved in writing. Except in an <br />emergency, no changes to the approved plan will be allowed until approval to change <br />such plan has been received. <br />The cost of all work included in the Maintenance of Traffic Plan shall be included in <br />the pay item for Maintenance of Traffic. <br />The Contractor shall be responsible for performing daily inspections, including <br />weekends and holidays, with some inspections at nighttime, of the installations on the <br />project and replace all equipment and devices not conforming with the approved <br />standards during that inspection. The project personnel will be advised of the <br />schedule of these inspections and be given the opportunity to join in the inspection as <br />is deemed necessary. <br />01025-2 Technical Specifications <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1414-49th St_58th Ave to 31st Ave\1-Admin\Bids\Bid <br />Documents\Adendums\Technical Specifications uPDATED 5-25-2017.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.