Laserfiche WebLink
Addendum #1 <br />2. Acceptable Material: FDOT #4 non -calcareous aggregate, washed and <br />meeting the requirements of FDOT Standard Specifications for Road and <br />Bridge Construction, Section 901. <br />I. Hay Bales: Hay bales shall not be used. <br />PART 3 - EXECUTION <br />A. Design, construct, and maintain the pollution control and treatment system to <br />minimize erosion and capture and remove pollutants from the construction site and <br />from all other areas disturbed by construction activities. <br />B. Apply polyacrylamide in strict accordance with the polyacrylamide <br />manufacturer/supplier's recommendations and specifications. <br />C. REPAIR ALL EROSION DAMAGE — At no additional cost to the OWNER and <br />regardless of the state of completion of the Work, immediately clean all dirt and <br />debris from all pipes and drainage structures; and repair all flooding, washouts, and <br />all other erosion damage to the Work. This responsibility shall not end until Final <br />Acceptance of the Work by the OWNER. Included is damage caused by erosion of <br />any kind (e.g. wind, waves, stormwater runoff, hurricanes, etc.) including Acts of God. <br />Restore all erosion damaged areas to design grades and elevations. Also, refer to <br />General Conditions 6.13.B. <br />Item of Payment <br />Payment for the work specified in this item shall be made under: <br />Bid Item No. 104-1 — Prevention, Control, and Abatement of Erosion and Water <br />Pollution- Per Lump Sum <br />[The remainder of this page was left blank intentionally] <br />01025-10 Technical Specifications <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1414-49th St_58th Ave to 31st Ave\1-Admin\Bids\Bid <br />Documents\Adendums\Technical Specifications uPDATED 5-25-2017.doc <br />