My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-147
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-147
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 2:21:56 PM
Creation date
10/17/2019 11:43:44 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/10/2019
Control Number
2019-147
Agenda Item Number
8.X.
Entity Name
Guettler Brothers Construction,
Subject
49th Street Milling and Resurfacing, 58th Avenue to 31st Avenue
FM NO. 436850-1-54-01
Project Number
IRC-1414
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Addendum #1 <br />C. Guarantee: All sodded areas shall be guaranteed for one year after date of final <br />acceptance. <br />Replacement of Defective Sod: Any dead sod or sod showing (less than 95% of a <br />square) indication of probable non survival or lack of health and vigor, or which do not <br />exhibit the characteristics to meet specifications, shall be replaced within two weeks <br />of notice from Owner or Engineer. All replacement sod shall be furnished/installed at <br />no additional cost to the Owner and shall be guaranteed for three months. All <br />replacement shall meet original specifications. <br />The Contractor shall notify the Owner and Engineer ten days prior to the end of the <br />guarantee period and such guarantee shall be extended until notification is received. <br />At the end of the guarantee period, all sod that is dead or in unsatisfactory growth <br />shall be replaced within two weeks. <br />D. Fertilizer: Commercial fertilizers shall comply with the Indian River County Fertilizer <br />Ordinance 2013-012 and Supplement Ordinance 2013-014 (see Appendix B). <br />E. Water for Grassing: Contractor shall provide the water used in the sodding <br />operations as necessary to meet the requirements of Article 570-3.6. <br />F. Preparation of Ground: The area over which the sod is to be placed shall be scarified <br />or loosened to a depth and then raked smooth and free from debris. Where the soil is <br />sufficiently loose and clean, the Owner, at his discretion, may authorize the <br />elimination of ground preparation. <br />G. Application of Fertilizer: Before applying fertilizer, the soil pH shall be brought to a <br />range of 6.0-7.0. <br />Contractor shall apply two (2) applications. The initial shall be fertilizer and the <br />second application shall be "weed and feed". <br />The fertilizer shall be spread uniformly over the sodded area at the rate of 436 <br />pounds per acre, or 10 pounds per 1,000 square feet, by a spreading device capable <br />of uniformly distributing the material at the specified rate. <br />Contractor shall apply applications as per manufacturer's specification. All tickets <br />from bags shall be handed over to the County Inspector. <br />On steep slopes, where the use of a machine for spreading or mixing is not <br />practicable, the fertilizer shall be spread by hand and raked in and thoroughly mixed <br />with the soil to a depth of approximately 2 inches. <br />H. Placing Sod: The sod shall be placed on the prepared surface, with edges in close <br />contact and shall be firmly and smoothly embedded by light tamping with appropriate <br />tools. <br />Where sodding is used in drainage ditches, the setting of the pieces shall be <br />staggered so as to avoid a continuous seam along the line of flow. Along the edges of <br />such staggered areas, the offsets of individual strips shall not exceed 6 inches. In <br />order to prevent erosion caused by vertical edges at the outer limits, the outer pieces <br />of sod shall be tamped so as to produce a featheredge effect. <br />Where sodding is placed abutting paved shoulder, the contractor is to ensure that the <br />finished sod elevation is 11/" below paved shoulder. <br />01025-19 Technical Specifications <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1414-49th St_58th Ave to 31st Ave\1-Admin\Bids\Bid <br />Documents\Adendums\Technical Specifications uPDATED 5-25-2017.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.