My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-147
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-147
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 2:21:56 PM
Creation date
10/17/2019 11:43:44 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/10/2019
Control Number
2019-147
Agenda Item Number
8.X.
Entity Name
Guettler Brothers Construction,
Subject
49th Street Milling and Resurfacing, 58th Avenue to 31st Avenue
FM NO. 436850-1-54-01
Project Number
IRC-1414
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Addendum #1 <br />RECORD/AS-BUILTS DRAWINGS FORMAT - SUBMITTAL <br />A. ENGINEER will supply the CONTRACTOR with the electronic file of the <br />approved construction plans for the input of the As -Built (record) information. <br />B. CONTRACTOR shall deliver seven (7) certified sets of Record/As-Builts with <br />Electronic Drawing files prepared in AutoCAD Civil 3D 2013 AND PDF format or in <br />current version as agreed by the ENGINEER. <br />C. CONTRACTOR's surveyor shall review, sign and seal As-Builts or Record <br />drawing(s). Said drawing(s) shall clearly state type of survey, positional tolerances, <br />adhere and be certified to by a registered Professional Surveyor and Mapper in <br />the state of Florida, any standards set forth by Florida Statutes, Administrative <br />code and Minimum Technical Standards for As-Built/Record surveys. <br />D. All Record/As-Built drawings are subject to review and approval by County <br />Surveyor. <br />ACCURACY <br />The CONTRACTOR will be held responsible for the accuracy and completeness of <br />Record Drawings and Electronic As-Builts and shall bear any costs incurred in finding <br />utilities as a result of incorrect data furnished by the CONTRACTOR. <br />COMPLETION OF WORK <br />Upon Substantial Completion of the Work, deliver Record Drawings/As-Built Drawings to <br />ENGINEER. Final payment will not be made until satisfactory record documents are <br />received and approved by ENGINEER. <br />AERIAL PHOTOGRAPH <br />The CONTRACTOR shall provide aerial photographs of the project every 30 days during <br />construction. The photographs shall be done in a manner to show the construction <br />progress for the entire length of the project. The photographs can be angled and not <br />prepared to a particular scale, however, must be detailed enough to identify the work in <br />detail. <br />Item of Payment <br />Payment for the work specified in this item shall be made under: Bid Item No. <br />999 — Record Drawings/As-Builts — Per Lump Sum <br />[The remainder of this page was left blank intentionally] <br />01025-25 Technical Specifications <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1414-49th St_58th Ave to 31st Ave\1-Admin\Bids\Bid <br />Documents\Adendums\Technical Specifications uPDATED 5-25-2017.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.