My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-169
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-169
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2019 3:06:32 PM
Creation date
10/23/2019 4:26:46 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
10/22/2019
Control Number
2019-169
Agenda Item Number
8.I.
Entity Name
FDOT Local Agency Program (LAP)
Subject
Agreement Authorizing the Chairman’s Signature for Sidewalk Improvements
Area
Airport Drive West to 41st Street (IRC-1503)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATPUE COPY <br />CERTIFICATION ON LAST PAGE <br />JA SMITH, CLERK <br />STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION 525-01040 <br />LOCAL. AGENCY PROGRAM AGREEMENT PROGRAM MANAGEMENT <br />OGC -12/18 <br />Page 1 of 1 <br />EXHIBIT "A" <br />PROJECT DESCRIPTION AND RESPONSIBILITIES <br />FPN: 440019-1-58-01 <br />This exhibit forms an integral part of the Local Agency Program Agreement between the State of Florida, Department of <br />Transportation and <br />Indian River Countv.(the Recipients <br />PROJECT LOCATION: <br />❑ The project is on the National Highway System. <br />❑ The project is on the State Highway System. <br />PROJECT LENGTH AND MILE POST LIMITS: 0.847 Miles - MP 1.220 to MP 2.067 <br />PROJECT DESCRIPTION: Construction of a .85 mile long 8' wide sidewalk on the East side of 431d Ave. between Airport <br />Dr. West and 41St St. The work will also include minor shoulder, ditch grading, minor drainage piping with drainage <br />structures. Signing and pavement markings. <br />SPECIAL CONSIDERATIONS BY RECIPIENT: <br />The Recipient is required to provide a copy of the design plans for the Department's review and approval to coordinate <br />permitting with the Department, and notify the Department prior to commencement of any right-of-way activities. <br />The Recipient shall commence the project's activities subsequent to the execution of this Agreement and shall perform in <br />accordance with the following schedule: <br />a) Study to be completed by .N/A <br />b) Design to be completed by NIA <br />c) Right -of -Way requirements identified and provided to the Department by N/A. <br />d) Right -of -Way to be certified prior to advertising for construction (All Phase 58 LAPS) <br />e) Construction contract to be let by 2/6/2020. <br />f) Construction to be completed by 12/31/2021. <br />If this schedule cannot be met, the Recipient will notify the Department in writing with a revised schedule or the project is <br />subject to the withdrawal of funding. <br />SPECIAL CONSIDERATIONS BY DEPARTMENT: <br />
The URL can be used to link to this page
Your browser does not support the video tag.