Laserfiche WebLink
ORDER NO. PSC -2019 -0265 -PAA -EQ <br />DOCKET NO. 20190082 -EQ <br />PAGE 12 <br />FLORIDA POWER & LIGHT COMPANY <br />Attachment A <br />Second Revised Sheet No. 9.034 <br />Cancels First Sheet No. 9.034 <br />(Continued from Sliot No. 9.033) <br />6. Testing Procedures <br />6.1 The Conunitted Capacity Test must be completed successfully within a sixty -hour period (the "Demonstration Period'), which <br />period, including the approximate start time of the Committed Capacity Test, shall be, selected and scheduled by the QS by means of a written <br />notice to FPL delivered at least thirty (30) days prior to the start of such period. The provisions of the foregoing sentence shall not apply to <br />any Committed Capacity Test required by FPL under any of the provisions of this Contract. FPL shall have the right to be present onsite to <br />monitor any Committed Capacity Test required or permitted under this Contract. <br />6.2 Committed Capacity Test results shall be based on a test period of twenty-four (24) consecutive hours (the "Committed <br />Capacity Test Period') at the highest sustained net KW rating at which the Facility can operate without exceeding the design operating <br />conditions, temperature, pressures, and other parameters defined by the applicable manufacturer(s) for steady state operations at the Facility. <br />If the QS is a REF the Committed Capacity Test shall be conducted utilizing as the sole fuel source fuels or energy sources included in the <br />definition in Section 366.91, Florida Statutes. The Committed Capacity Test Period shall commence at the time designated by the QS <br />pursuant to Section 6.1 or at such other time requested by FPL pursuant to Section 5.3; provided, however, that the Coni» tted Capacity Test <br />Period may commence earlier than such time in the event that FPL is notified 0C and consents to, such earlier time. <br />6.3 For the avoidance of doubt, normal station service use of unit auxiliaries, including, without limitation, cooling towers, heat <br />exchangers, and other equipment required by law, shall be in service during the Committed Capacity Test Period. Further, the QS shall affect <br />deliveries of any quantity and quality of contracted cogenerated steam to the steam host during the Committed Capacity Test Period. <br />6.4 The capacity of the Facility shall be the average nct capacity (generator output minus auxiliary) measured over the Committed <br />Capacity Test Period. <br />6.5 The Corm -tatted Capacity Test shall be performed according to prudent industry testing procedures satisfactory to FPL for the <br />appropriate technology of the QS. <br />6.6 Except as otherwise provided herein, results of any Committed Capacity Test shall be submitted to FPL by the QS within seven <br />(7) days ofthe conclusion of the Committed Capacity Test. <br />7. Payment for Electricity Produced by the Facility <br />7.1 Energy <br />FPL agrees to pay the QS for energy produced by the Facility and delivered to the Delivery Point in accordance with the rates and <br />procedures contained in FPL's approved Rate Schedule QS -2, attached hereto as Appendix A, as it may be amended froth time to time and <br />pursuant to the election of energy payment options as specified in Appendix E. The Parties agree that this Contract shall be subject to all of <br />the provisions contained in Rate Schedule QS -2 as approved and on file with the FPSC. <br />7.2 Firm Capacity. <br />FPL agrees to pay d>~ QS for the firm capacity described in Section 5 in accordance with the rates and procedures contained in <br />Rate Schedule QS -2, attached hereto as Appendix A, as it maybe amended and approved from time to time by the FPSC and pursuant to the <br />election of a capacity payment option as specified in Appendix E. The QS understands and agrees that capacity payments will be made under <br />the early capacity payment options only lithe QS has achieved the Capacity Delivery Date and is delivering firm capacity and energy to FPL. <br />Once elected by the QS, the capacity payment option cannot he changed during the term of this Contract. <br />7.3 Payments <br />Payments due the QS will be made monthly and normally by the twentieth business day following the end of the bitting period. A <br />statement of the kilowatt-hours sold by the QS and the applicable avoided energy rate at which payments are being made shall accompany the <br />payment to the QS. <br />(Continued on Sheet No. 9.035) <br />Issued by' S E. Romig, Director, Rates and Tariffs <br />Effective: September 13, 2016 <br />