My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-167F
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-167F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2019 1:10:45 PM
Creation date
11/15/2019 1:10:43 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
10/15/2019
Control Number
2019-167F
Agenda Item Number
8.E.
Entity Name
Indian River Lagoon Council National Estuary Program (IRLC NEP)
Subject
Cost-share agreement for Lost Tree Island Enhancement
Area
Lost Tree Island
Project Number
IRL2019-18
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contract#IRL2019-18 <br /> Encumbrance#GL01-1736/GL01-1895 <br /> nuisance native species. Desirable wetland vegetation immediately colonized the shoreline areas, <br /> and the wetlands exceeded 90%cover by desirable species within three years of construction. <br /> For reference,sample monitoringphoto. a.hs of the LTICA .ast .ro'ects are •resented below. <br /> 6yy <br /> y f A p <br /> L, :' • <br /> Lost Tree ilial . *..rucn aOon Arrr <br /> .Acre Retto at.on(-umplcid ZOOS IS <br /> Credit:Indian RtvcrCtwnty rctonn:try Q f/.th rowcll <br /> The second and third mitigation projects were constructed on the northern end of Duck Head Island. <br /> Construction was completed in late 2009. These projects ground the Brazilian pepper and smaller <br /> Australian pines in place. The mulch was used to minimize erosion. A portion of the larger <br /> Australian pines were killed using herbicides and left in place for perching sites.This plan included <br /> engineered re-grading to create submergent and emergent wetlands. As part of the engineered <br /> design,the soil balance for the site allowed for the creation of upland coastal hammock.The project <br /> site was vegetated using a combination of planted nursery stock and natural recruitment.Desirable <br /> cover of vegetation was achieved on this site within 3-5 years (the longer duration for upland <br /> communities). <br /> F�- <br /> IMO IMP IMM., <br /> T •-1 <br /> 111111111, r" <br /> o <br /> /41. .1 <br /> -! .f ....0064. or <br /> Loa Tn.Wank t'..nmvmt.•n 4ca <br /> Du-,Il.rd lal.utd•1'.5-'r Knnvni.+t t„mpkrrd 2IMt-:015 <br /> l',,..1.1111, nu.,.1 dt 61116t p.at pYNinE Plumo t matt Indrtn Rner 11.11,1,toom•y do Ik.rh P well <br /> Page 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.