My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-166B
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-166B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2019 12:53:10 PM
Creation date
11/19/2019 12:52:38 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
10/08/2019
Control Number
2019-166B
Agenda Item Number
8.F.
Entity Name
Tetra Tech, Inc.
Subject
Work Order 5
Assistance with the Research and Review Phase of the Indian River County Lagoon Management Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r}rheae hourly billing rates will rems'n effective for the Initial duration of this' Agnnrntnnt, are may be rene0oliatec shouid <br />an addilIcnal renewal period be exercised. <br />Exhibit $ <br />Tetra Tech, Inc. <br />Indian River County <br />Professional <br />Services Hourly Rate <br />Fee Schedule <br />Effective October <br />1, 2017, through Seplember 30, 2020131 <br />new labor Rates <br />Wrest labor <br />Raw Labor Rates x Multiplier <br />Rate <br />Polyer/Tlttes <br />Mlrlmum <br />Maximum <br />Muld;iller <br />mlithaun <br />Maximum <br />Project Alanapemect <br />Sr Proje_t Marllgor <br />$ <br />52.CO <br />$ 80.0c <br />3.0 <br />$ <br />156.00 <br />$ <br />240,OD <br />Project Manager <br />$ <br />4LCO <br />S 68.0E <br />1.0 <br />S <br />123.00 <br />$ <br />204.OD <br />Enginee s <br />Principal Engineer <br />S <br />70.00 <br />S 99.00 <br />3.0 <br />$ <br />710.1X5 <br />$ <br />797.OD <br />Sr. Engineer <br />S <br />50.03 <br />S 79.00 <br />3.0 <br />$ <br />150.00 <br />$ <br />237.00 <br />EngineerV <br />$ <br />39.00 <br />$ 61.00 <br />3.0 <br />S <br />117M <br />S <br />183.00 <br />Eaginmr IV <br />$ <br />32.00 <br />S 49.0D <br />3.0 <br />$ <br />96.00 <br />$ <br />147.00 <br />Enelnerr is <br />$ <br />2600 <br />S 40.01 <br />3.0 <br />$ <br />78.00 <br />$ <br />120.00 <br />Engineer tl <br />$ <br />2400 <br />$ 34.03 <br />3.0 <br />S <br />72.nn <br />$ <br />10700 <br />Englnear i <br />S <br />2230 <br />S 29.00 <br />3.0 <br />S <br />66.00 <br />$ <br />87 W <br />Engineering Technician <br />$ <br />1230 <br />$ 22.00 <br />3.0 <br />5 <br />36.00 <br />$ <br />66.00 <br />Scientists <br />Scientist VI <br />$ <br />4500 <br />$ 71.CO <br />3.0 <br />S <br />135.03 <br />$ <br />213.00 <br />StlendstV <br />$ <br />31.00 <br />$ S7.00 <br />3.0 <br />S <br />93.07 <br />$ <br />271,00 <br />Sdentht IV <br />$ <br />27.00 <br />$ 38.00 <br />3.0 <br />$ <br />61.03 <br />5 <br />114,00 <br />Scientkt III <br />$ <br />24.00 <br />$ 30.CO <br />3.0 <br />$ <br />72.03 <br />$ <br />90.00 <br />Scientist II <br />$ <br />20.00 <br />$ 26.00 <br />3.0 <br />$ <br />6U.03 <br />$ <br />78.00 <br />Scier%W 1 <br />$ <br />19.00 <br />S 23.010 <br />3.0 <br />$ <br />S7.03 <br />5 <br />69.00 <br />Oesige Profeulonse <br />Sr CAO/Erg Designer n <br />$ <br />39 00 <br />$ $2.00 <br />3.0 <br />S <br />117.C) <br />S <br />156.00 <br />Sr CAO/Erg Designer I <br />$ <br />26.00 <br />$ 40.00 <br />3.0 <br />$ <br />78.0 <br />$ <br />170.0: <br />CAD/Engtneerin3Designer 01 <br />$ <br />24.00 <br />$ 33.00 <br />3.0 <br />S <br />72.0 <br />S <br />99.0c <br />CAD1EngneeringDedg-wr9 <br />$ <br />1&00 <br />S 24.00 <br />3.0 <br />S <br />54.00 <br />S <br />72.00 <br />CPAD/EngineeringDesigner I <br />S <br />16.00 <br />$ 21.00 <br />3.0 <br />$ <br />48.CO <br />S <br />63.0C <br />Sump" <br />Sr land Surveye, <br />$ <br />41.00 <br />$ 50.00 <br />3.0 <br />S <br />123.:0 <br />$ <br />ISO=. <br />Lend Surveyor <br />$ <br />28.0D <br />S 40.00 <br />3.0 <br />S <br />8430 <br />S <br />120.7 <br />Survey Crew Chief <br />$ <br />24.00 <br />$ 38.00 <br />3.0 <br />S <br />7200 <br />S <br />114.03 <br />Survey Tech <br />$ <br />17.00 <br />S 30,00 <br />3.0 <br />$ <br />5100 <br />$ <br />90" <br />Architects <br />Architectural Program Mgr <br />S <br />65,00 <br />$ 85.00 <br />3.0 <br />S <br />195.00 <br />$ <br />25S.00 <br />Sr Architect <br />5 <br />55M <br />$ 7S.00 <br />3.0 <br />S <br />165.00 <br />S <br />225.00 <br />Architect <br />$ <br />33.00 <br />$ 55.00 <br />3.0 <br />S <br />105.00 <br />S <br />165.0 <br />ArchitecturaI Designer <br />$ <br />17.:0 <br />$ 35.00 <br />3.0 <br />$ <br />51.00 <br />$ <br />13501 <br />Ceanructlon Profession MIS <br />corstructionProjectPop <br />S <br />22,00 <br />S 42.00 <br />3.0 <br />$ <br />65.00 <br />$ <br />126.CO <br />Construction Manager U <br />S <br />50.00 <br />$ 70.00 <br />3.0 <br />$ <br />150.00 <br />$ <br />2i0.00 <br />COrstruction Manager l <br />$ <br />38.00 <br />$ 54.00 <br />3.0 <br />S <br />114.00 <br />S <br />362.00 <br />CorstructionAd.nln'strator <br />$ <br />29.00 <br />$ 39.CC <br />3.0 <br />$ <br />69.00 <br />S <br />117.00 <br />WSAnielysts <br />SrAnarlyst <br />$ <br />30.30 <br />S G5.00 <br />3.0 <br />$ <br />90.00 <br />$ <br />195.00 <br />Project An '15'.1! <br />S <br />24.DO <br />S 40.C3 <br />3.0 <br />$ <br />72.00 <br />S <br />12C.00 <br />Project Analyst.. 1 <br />$ <br />18.00 <br />$ 28.00 <br />3.0 <br />$ <br />54.00 <br />$ <br />84.00 <br />Project AdminWradaw <br />SrProjedAcirriniWator <br />$ <br />27.00 <br />$ 3S.00 <br />3.0 <br />$ <br />81,00 <br />S <br />105.00 <br />Projact Administrator <br />$ <br />15.00 <br />$ 31.00 <br />3.0 <br />$ <br />45.011 <br />$ <br />96.00 <br />Project Assistant <br />S <br />12.00 <br />S 22,00 <br />3.0 <br />$ <br />36.00 <br />$ <br />66.00 <br />ContractAdministntor <br />$ <br />25.00 <br />S 36.0) <br />34 <br />$ <br />7S.CC <br />$ <br />308.00 <br />Subtonsultdnt <br />Costa 109 <br />eadmirw4able Expenses <br />EnglneersReimbursable TraveWreage <br />At Cost <br />Other Direct Costs <br />At Cost <br />r}rheae hourly billing rates will rems'n effective for the Initial duration of this' Agnnrntnnt, are may be rene0oliatec shouid <br />an addilIcnal renewal period be exercised. <br />
The URL can be used to link to this page
Your browser does not support the video tag.