My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-166C
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-166C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2019 1:13:01 PM
Creation date
11/19/2019 1:10:44 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
10/08/2019
Control Number
2019-166C
Agenda Item Number
8.G.
Entity Name
Kimley-Horn and Associates, Inc.
Subject
Work Order 22
Water Distribution System Hydraulic model: Calibration, Evaluation, and Flushing Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Consultant will deliver an electronic WaterCAD 00.01.01.04 format compatible with <br />Series 5 for 2019/2020 conditions. <br />Task 5 —Limited Unidirectional Flushing Maps <br />The Consultant can provide up to 200 hours of engineering time for services related to <br />the preparation of unidirectional flushing map(s) for areas of with poor water quality. <br />Effort beyond this amount will be considered additional services and can be performed <br />for an agreed upon fee if needed or as part of separate work orders. The following is a <br />list of services that the Consultant could perform as a part of these hours: <br />o Meet with County staff to identify and prioritize areas with dirty/cloudy water and <br />confirm design criteria for hydrant flushing <br />o Provide zone flushing map(s) for areas with dirty/cloudy water. These maps <br />typically include flushing location, piping materials available and size, and <br />sequential flushing directions for each identified piping segment in order to open <br />and close the UDF hydrants and valves during flushing activities. <br />ADDITIONAL ITEMS NOT INCLUDED UNDER SCOPE <br />• Capacity Analysis Report Update <br />• Additional field testing with Roseland improvements completed <br />• Improvements outside the primary service area <br />• Multiple scenarios beyond those listed <br />• Updating IRCU's GIS files <br />• Re-establish Stage 2 Testing locations if necessary <br />• Development of system scenarios for 5 yr, 10 yr, 20 yr, and build out conditions <br />• Master Planning for Water Supply, Permitting, Treatment Capacity and Distribution <br />System including reviewing impacts for annexing land from Sebastian <br />• Meetings beyond those listed herein can be provided as an additional service. <br />• Unidirectional Flushing Plans beyond what is described in the Scope of Services <br />OWNER FURNISHED ITEMS & SUPPORT <br />• Staff for hydrant flushing and pressure recording gages, equipment, etc. <br />• 2018 and 2019 MOR data <br />• Record drawings for improvements that have been constructed since January 2014 <br />• Available pressure data throughout the model area <br />• Identification of areas of known low system pressures or high residence time <br />• Identification of areas with known water quality issues <br />• Current water plant and pump station operational data <br />• Plans for service area expansion and/or significant planned development <br />• Recent infrastructure improvements <br />• Available reports for distribution system (i.e. Hydromax valve report) <br />
The URL can be used to link to this page
Your browser does not support the video tag.