My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-193
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-193
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2019 1:30:02 PM
Creation date
11/19/2019 1:29:46 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
11/14/2019
Control Number
2019-193
Entity Name
REI Engineers
Subject
Work Order No. 10 Championship Hall roof replacement services,
Jackie Robinson Training Complex IRC-1839
Project Number
IRC-1839
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENGINEERS <br /> November 4, 2019 <br /> Indian River County <br /> 1801 27th Street <br /> Vero Beach, FL 32960 <br /> Attention: Richard B. Szpyrka P.E. <br /> Public Works Director <br /> Reference: Proposal for Engineering Services, Permitting Assistance, <br /> Contract Documents and Construction Administration <br /> Jackie Robinson Training Complex <br /> Championship Hall Roof Replacement <br /> REI Proposal No: P19TPA-047 Revision 2 <br /> Dear Mr. Szpyrka: <br /> In response to our recent discussions, we are pleased to submit this proposal for your consideration. The roof <br /> areas outlined in this proposal include roof sections of the facility located at 3901 26th St, Vero Beach, FL <br /> 32960 (totaling approximately 16,640 square feet). The following is an outline of the proposed services for <br /> Contract Documents and Construction Administration: <br /> I. STRUCTURAL ANALYSIS <br /> A. REI will coordinate with a licensed Structural Engineer for determination of structure's roof wind <br /> load capacity based on 2017 Florida Building Code requirements. <br /> B. REI will coordinate with a licensed Structural Engineer for generating repair drawings for up to <br /> three exterior exposed footers. <br /> II. CONTRACT DOCUMENTS <br /> A. Conduct the site visit(s) to develop detailed Contract Documents for the subject building. <br /> B. Extract roof samples to identify roof system composition and condition. Cored locations to be <br /> repaired with compatible materials. <br /> C. No asbestos testing is included in this proposal. <br /> D. Perform the following engineering design calculations for all roof areas which will be sealed by a <br /> Licensed Engineer: <br /> E. Determine design wind loads in accordance with ASCE 7 as required by the current edition of the <br /> State Building Code. <br /> F. Determine Primary drainage for compliance with the current edition of the State Plumbing Code. <br /> Engineering solutions for tomorrow" PAGE 1 of 3 <br /> 10150 Highland Manor Drive, Suite 200 reiengineers.com <br /> Tampa. FL 33610 813.944.2137 <br />
The URL can be used to link to this page
Your browser does not support the video tag.