My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-193
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-193
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2019 1:30:02 PM
Creation date
11/19/2019 1:29:46 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
11/14/2019
Control Number
2019-193
Entity Name
REI Engineers
Subject
Work Order No. 10 Championship Hall roof replacement services,
Jackie Robinson Training Complex IRC-1839
Project Number
IRC-1839
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REI ENGINEERS PROPOSAL#P19TPA-047 Revision 2 <br /> G. Upon completion of work, verify compliance of warranties and forward to Owner with close out <br /> documents and final billing. <br /> H. Conduct a 2-year Contractor Warranty Inspection before the warranty expires to address warranty <br /> issues with the Contractor and Manufacturer. <br /> IV. PROPOSED SCOPE OF CONSTRUCTION WORK <br /> A. Remove existing roof systems down to the existing structural framing and provide new roof <br /> system along with sheet metal flashing and accessories to provide a complete, watertight, <br /> warrantable roof assembly. <br /> V. ESTIMATED ENGINEERING FEES <br /> Based on the anticipated scope of work for this project, the lump sum engineering fees are as follows: <br /> Engineering Fees: <br /> Structural Analysis: <br /> Subcontractor Fee Estimate $6,200.00 <br /> Contract Management $620.00 <br /> Contract Documents: <br /> Contract Documents $20,715.00 <br /> Bidding $1,250.00 <br /> Construction Administration: <br /> Construction Administration $16,570.00 <br /> Total Engineering Fee $45,355.00 <br /> VI. PROJECT SCHEDULE <br /> A. Preliminary Contract Documents shall be completed within thirty (30) days of Notice to Proceed. <br /> Final Contract Documents shall be completed and sealed within ten (10) days of receipt of <br /> comments. <br /> B. Construction Administration shall be performed during the estimated construction duration and <br /> the project closeout process. This work is expected to take forty-five (45) days calendar days. <br /> If this proposal meets with your approval, please notify us in writing. This proposal will remain firm for a period <br /> of thirty (30) days. After that time, we reserve the right to review scheduled commitments and prices. <br /> If you have any questions, please do not hesitate to call. <br /> REI Engineers <br /> Mark Renninger, PE, RRC <br /> Branch Manager <br /> Attachment "A": MBV Structural Engineering Proposal <br /> PAGE 3 OF 3 <br /> Engineering solutions for tomorrow'"" <br /> 10150 Highland Manor Drive, Suite 200 reiengineers.com <br /> Tampa, FL 33610 813.944.2137 <br />
The URL can be used to link to this page
Your browser does not support the video tag.