My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-193
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-193
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2019 1:30:02 PM
Creation date
11/19/2019 1:29:46 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
11/14/2019
Control Number
2019-193
Entity Name
REI Engineers
Subject
Work Order No. 10 Championship Hall roof replacement services,
Jackie Robinson Training Complex IRC-1839
Project Number
IRC-1839
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KUMr. Mark Renninger, P.E. REI Attachment "A" <br /> October 31,2019 <br /> Page 2 <br /> Proposal: 19-0357 <br /> 3. Conduct a field investigation to determine the current dimensions and conditions of the <br /> metal girts for the roofing system. <br /> 4. Conduct a preliminary assessment of the structure, recording the extent and nature of <br /> observed problems on structural members as related to the columns and footer repairs. <br /> 5. Determine repairs for unsafe or potentially hazardous conditions that require immediate <br /> action. <br /> 6. Preparation of the structural design and drawings for the repair as needed of the structural <br /> system to include: <br /> a. Roofing system modification <br /> b. Column base repair <br /> c. Foundation repair <br /> d. Structural Connections <br /> C. Cost of Work/Services Performed: <br /> We propose to provide the above described services for a total fee of$6,200, excluding direct <br /> costs. The contract price includes providing certified copies for the permitting process, and two <br /> coordination meetings with the owner or his agent. It is assumed that other building plans <br /> development and permitting will be done by others and is not part of this contract. <br /> We are available to begin work described herein upon our receipt of your written acceptance of <br /> this proposal/contract. This proposal is valid if accepted within ninety (90) days from the date of <br /> this proposal/contract. In addition to the above scope, our Agreement shall include and be subject <br /> to the conditions in the below Standard Provisions,which are incorporated by reference. <br /> Should you require further information or clarification,please call. <br /> Sincerely, <br /> Rodolfo i la izar,P.E. <br /> Vice Pr sident, MBV Engineering, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.