My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-184
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-184
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 10:44:53 AM
Creation date
11/20/2019 10:44:38 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
11/05/2019
Control Number
2019-184
Agenda Item Number
8.R.
Entity Name
Masteller & Moler, Inc.
Subject
Work Order 7
8th Street 24" Force Main Relocation
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT "A" <br />WORK ORDER 7 <br />81h Street 24" Force Main Relocation <br />Masteller & Moler, Inc. is pleased to present you with Work Order Number 7 which provides Professional <br />Engineering Services for design, permitting, and specifications with bidding services. <br />Proiect Description <br />The State of Florida Department of Transportation, along with Indian River County plans to construct a bridge <br />replacement project for the 8th Street bridge over the Lateral "C" Canal at 74th Avenue in Vero Beach, Florida. <br />Said project requires that Indian River County Utilities relocate certain existing wastewater improvements in <br />advance of the referenced project in order to eliminate conflicts with the bridge replacement design. The <br />existing 24" force main on the south side of 8th Street will need to be relocated and replaced with a new force <br />main system. Any adjustments necessary to the existing potable water main system and related accessories, <br />including gate valves, etc. are not included as part of this Work Order Number 7. <br />The estimated Construction Cost for the Utility Improvements Scope of Services for Work Order No. 7 is <br />$440,000.00. <br />In order to expedite the Project Scope and to not duplicate acquisition of survey information previously prepared <br />by the FDOT, County has provided Consultant with copies of the FDOT's Roadway Improvement Plans, both hard <br />copy and AutoCAD format. These documents include route survey information and proposed roadway and <br />stormwater improvements construction details. It is understood that the information provided reflects <br />"Preliminary" design of the project improvements, and that changes to the current Plans may occur. <br />Furthermore, it is understood that the County has obtained authorization from the FDOT to allow said <br />information to be used by Consultant in the performance of the Scope of Services described herein. <br />In order that Indian River County may construct the required utility replacements as described above, Consultant <br />proposes to perform the following scope of services; <br />Scope of Services <br />Task A — Surveying Services <br />The drawings provided by County to Consultant in AutoCAD format represent raw survey data acquired by the <br />FDOT's roadway consultant and/or their sub -consultants. The data, in its current format, is not usable in the <br />preparation of the Construction Plans. The raw data will need to be converted into a final product that will be <br />used as the Base Plans for the project. Consultant will utilize the services of our survey sub -consultant, Masteller, <br />Moler, & Taylor, Inc. to convert the raw data into a Route Survey and Base Plans. <br />Task B — Engineering Design & Preparation of Construction Plans <br />Consultant shall use the aforementioned Base Plans for design and preparation of Construction Plans for a new <br />24" PVC wastewater force main including a directional bore underneath the Indian River Farms Water Control <br />District's (IRFWCD's) Lateral "C" Canal. Consultant shall prepare plans and specifications which shall include <br />requirements for connection of the new utilities to existing systems to remain. Plans and specifications will also <br />Exhibit A — Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.