Laserfiche WebLink
Work Order No. 24 <br />Moorhen Marsh Headworks <br />Structural Services <br />EXHIBIT C — TIME SCHEDULE <br />Upon authorization to proceed by the COUNTY, final design documents are expected <br />to take approximately six (6) weeks from the Notice to Proceed (NTP). <br />NTP <br />Interim Submittal (90% Design Drawings) <br />Final Submittal (100% Design Drawings) <br />contingent upon BOCC approval <br />4 weeks following NTP <br />2 weeks following 90% comments <br />(THE REMAINDER OF THIS PAGE IS INTENTIONALLY BLANK) <br />Page 5 of 6 <br />