My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2/14/1995
CBCC
>
Meetings
>
1990's
>
1995
>
2/14/1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:05:10 PM
Creation date
6/16/2015 2:15:39 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
02/14/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOOK 94 PACE 356 <br />Director Jim Davis explained that the department has been <br />working with the City of Sebastian Community Development <br />Department, Bruce Cooper particularly, to determine when the <br />Sebastian Lakes commercial property is going to be developed. <br />There has been speculation on this particular property since before <br />the library property was purchased but there has been no movement <br />for 4-5 years. They are trying to make sure that, once that <br />property develops, we will have a viable connection from the east <br />parking lot to Roseland Road extension which will negate the need <br />for the left turn lane on CR -512; however, since they are not sure <br />of the timing on the Sebastian Lakes property, they felt it <br />critical to the library ingress and egress to put a left turn lane <br />on CR -512 to access the CR -512 driveway. That is part of the <br />change order. <br />Commissioner Adams questioned why it would negate the need of <br />the left turn lane on CR -512 if the Roseland Road extension were <br />completed. <br />Director Davis responded that the Roseland Road extension will <br />provide a signalized intersection connection on the east driveway <br />at the library and will be much safer for people either westbound <br />on CR -512 to turn at the traffic signal on Roseland Road and then <br />into the library. It will not affect eastbound traffic as that is <br />a right turn. The median opening can be left after the <br />signalization is installed and the Roseland Road extension is <br />complete, but a safer situation would be for people to use the <br />signalized intersection. <br />ON MOTION by Commissioner Eggert, SECONDED by <br />Commissioner. Adams, the Board unanimously approved <br />Change Order No. 4 with Martin Paving for a net <br />change in the contract amount of $75,078.38, making <br />the new contract price $2,858,652.53, as recommended <br />by staff. <br />CHANGE ORDER NO. 4 IS ON FILE IN THE OFFICE OF THE <br />CLERK TO THE BOARD <br />FEBRUARY 14, 1995 26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.