My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/17/2019
CBCC
>
Meetings
>
2010's
>
2019
>
09/17/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2019 2:33:26 PM
Creation date
12/6/2019 10:24:50 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
09/17/2019
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
347
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Element <br />Policy #, <br />Objective #, <br />Text <br />Summary <br />Page <br /># <br />What the change is <br />Description of how "Capacity" is <br />calculated for roadways. <br />160 <br />Modify to allow for appropriate road <br />capacity adjustment factors to state <br />road categories of the appropriate <br />tables in the most current version of <br />Florida's Level of Service Handbook. <br />Also modify the list of alternative <br />options for determining roadway <br />capacity, to include any generally <br />accepted capacity determination <br />methodology approved by the Public <br />Works Director. <br />Inclusion in the County's <br />concurrency management system of <br />added capacity of certain roadway <br />projects listed in the County's <br />Schedule of Capital Improvements. <br />160. <br />Change time period reference of the <br />County's Schedule of Capital <br />Improvements Plan to reflect current <br />practice from a "Seven" year plan to a <br />"Five" year plan and correct related <br />reference to allowing use of capacity <br />from roadway projects listed within the <br />first three years of a five year schedule. <br />Transportation <br />Policy 1.6 <br />Time period for reviewing and <br />updating the traffic impact fee <br />schedule. <br />162 <br />Change to be consistent with the <br />County's recently modified impact fee <br />ordinance to make it a requirement to <br />update the impact fee schedule at least <br />once every five years. <br />Transportation <br />Policy 1.7 <br />Imposition of all or part of the one to <br />five cent local option gas tax. <br />162 <br />Change from requiring that the County <br />impose by 2015 part or all of the tax, to <br />the County shall consider imposing all <br />or part of the tax by 2023. <br />Transportation <br />Policy 1.10 <br />Requirement that the County through <br />its land development regulations <br />establish various transportation <br />related design standards. <br />162 <br />Change the design standard <br />requirement of "Provision of Service <br />roads" to "Provision of Service roads <br />or other means of shared access and <br />interconnections" to reflect current <br />code and practice. <br />Transportation <br />Policy 1.11 <br />Requirement that the County will <br />periodically review its off-street <br />parking requirements <br />162 <br />Change requirement that parking be <br />based upon information from "parking <br />studies" to "ITE (Institute of Traffic <br />Engineers) parking data and parking <br />studies". <br />Transportation <br />Policy 1.12 <br />County adoption of 2030 Cost <br />Feasible Plan project list. <br />163 <br />Change reference to "2030" Cost <br />Feasible Plan to "2040" Cost Feasible <br />Plan to reflect adopted 2040 LRTP. <br />Transportation <br />Policy 2.4 <br />County's development of ITS <br />(Intelligent Transportation System) <br />infrastructure consistent with FDOT <br />and national ITS architectural <br />standards. <br />163 <br />Spell out the abbreviation so that it <br />reads "ITS (Intelligent Transportation <br />System)" <br />1374 <br />
The URL can be used to link to this page
Your browser does not support the video tag.