My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/13/2019 (3)
CBCC
>
Meetings
>
2010's
>
2019
>
08/13/2019 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2020 12:42:49 PM
Creation date
12/6/2019 10:40:33 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
08/13/2019
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
592
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ANALYSIS: <br />Most, but not all, of the required improvements for Bridgehampton have been completed. As <br />provide d for under the LDRs applicable to this final plat application, the developer is proposing to <br />"bond -out" for the remaining 10.41% of required improvements (roadways, landscape, sidewalks). <br />Public Works and Planning staff have reviewed and approved the submitted Engineer's Certified <br />Cost Estimate for the remaining improvements. The County Attorney's Office has reviewed and <br />approved the submitted Contract for Construction of Required Improvements. The County <br />Attorney's Office has received a cash deposit and escrow agreement with supporting security in <br />the amount of $87,634.13 to guarantee construction of the remaining required improvements. <br />All improvements within Bridgehampton will be private, with the exception of certain utility <br />facilities which will be serviced by the City of Vero Beach. It is noted that the City of Vero Beach <br />Water and Sewer Department is not requiring any bonding with respect to utilities and has no <br />objection to the final plat moving forward. In addition, a warranty and maintenance agreement for <br />the roads and stormwater improvements, along with an acceptable 1 -year warranty security will <br />be required prior to issuance of a Certificate of Completion. <br />RECOMMENDATION: <br />Staff recommends that the Board grant final plat approval for Bridgehampton. <br />ATTACHMENTS: <br />1. Location Map <br />2. Final Plat Layout <br />162 <br />
The URL can be used to link to this page
Your browser does not support the video tag.