My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-020
CBCC
>
Ordinances
>
2010's
>
2019
>
2019-020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2019 3:01:14 PM
Creation date
12/11/2019 1:13:45 PM
Metadata
Fields
Template:
Ordinances
Ordinance Number
2019-020
Adopted Date
12/03/2019
Agenda Item Number
10.A.1.
Ordinance Type
Comprehensive Plan Amendment
State Filed Date
12\10\2019
Entity Name
Indian River County
2030 Comprehensice Plan, Capital Improvements Element
Subject
Chapter 6, Supplement 19
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Comprehensive Plan Capital Improvements Element <br />Applicable elements of the plan identify the rates to be applied to each project to determine facility <br />demand. Traffic volumes, for example, can be derived by applying a trip rate to the size of the <br />project. Sanitary sewer and potable water both have rates of 250 gallons per day per equivalent <br />residential unit. Other public facility rates are discussed fully in their applicable Comprehensive Plan <br />Element. Like existing demand, committed demand must be determined on a facility by facility basis. <br />For example, both existing demand and committed demand must be determined for each major <br />roadway, each school, each treatment plant, each major drainage conveyance, and the active cell in the <br />landfill. Also, like existing demand, committed demand estimates must be modified as projects are <br />completed; committed demand estimates must also be modified as new development orders are <br />approved and old development orders are terminated. <br />Proiected Demand <br />The third type of demand is projected demand. This consists of two types. One is non- <br />committed/non-reserved, single-family lot demand for all subdivisions, while the other is new project <br />demand. <br />Non-committed/non-reserved single-family lot projected demand to the facility impacts associated <br />with construction on individual single-family lots in platted subdivisions and construction on legally <br />established individual single-family unplatted lots and acreage will constitute a de minimus impact on <br />public facilities and thus be exempt from concurrency review. Single-family home traffic impacts will <br />be accounted for through tracking single-family trips for use in development project traffic studies and <br />annual traffic count updates. <br />The second type of projected demand is new project demand. For each new project, demand <br />estimates must be made on a facility by facility basis. Only if sufficient available capacity exists for <br />each facility to be impacted can the project be approved and a development order issued. Upon <br />issuance of a development order, the estimated impacts on each facility would be considered as <br />committed demand. <br />Availability of Capacity <br />Facility capacity can be assessed two different ways. First, facility capacity can be determined by <br />facilities that are existing and available; examples would be existing treatment plants and existing <br />roadways with a set number of lanes. The second manner for assessing facility capacity is to consider <br />both existing, in -the -ground facilities as well as facility expansions or new facilities which are <br />programmed but not yet existing. <br />As part of the concurrency review process, the capacity of existing, in -the -ground facilities will be <br />considered in all cases. Programmed facilities will be considered in assessing capacity for each public <br />facility category when the following conditions are met: <br />➢ For sanitary sewer, potable water, solid waste and drainage facilities: <br />Community Development Department Indian River County <br />Adopted December 3, 2019, Ordinance 2019-020 42 <br />
The URL can be used to link to this page
Your browser does not support the video tag.