My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-205
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-205
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2019 4:50:21 PM
Creation date
12/16/2019 4:46:54 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
12/10/2019
Control Number
2019-205
Agenda Item Number
12.F.1.
Entity Name
Rio-Bak Corporation
Subject
Change Order Form
Sector 5 Beach and Dune Restoration Project
Area
Sector 5
Project Number
IRC-1923
Bid Number
2019066
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00942 - Change Order Form <br />No. 1 (Page 1 of 3) <br />DATE OF ISSUANCE: 12/10/2019 EFFECTIVE DATE:12/10/2019 <br />OWNER: Indian River County <br />CONTRACTOR RIO-BAK CORPORATION <br />Project: Sector 5 Beach and Dune Restoration Project <br />OWNER'S Bid No. 2019066 <br />IRC PROJECT: IRC -1923 <br />You are directed to make the following changes in the Contract Documents: <br />1. All reimbursements for overtime/holiday pay for the County inspectors/engineers that occurs <br />as a result of the increased quantities from erosion due to Hurricane Dorian will be the <br />responsibility of the County. <br />Section 00800 — Supplementary Conditions shall be modified as follows: <br />SC -6.026 <br />4. All costs of inspection and testing performed during overtime work by the <br />CONTRACTOR, which is allowed solely for the convenience of the CONTRACTOR, <br />shall be borne by the CONTRACTOR, and a credit given to the OWNER to deduct <br />the costs of all such inspection and testing from any payments otherwise due the <br />CONTRACTOR. Overtime work incurred due to the impacts of Hurricane <br />Dorian and resulting increase in quantities shall be exempt from SC -6.026-4. <br />All costs of inspection and testing incurred by the OWNER due to the quantity <br />increase resulting from Hurricane Dorian shall be the responsibility of the <br />OWNER. <br />5. All costs of OWNER's employees and costs of ENGINEER's Consultant resulting <br />from overtime work by the CONTRACTOR, which is allowed solely for the <br />convenience of the CONTRACTOR, shall be borne by the CONTRACTOR, and a <br />credit given to OWNER to deduct all such costs from any payments otherwise due <br />the CONTRACTOR. Overtime work incurred by the impacts of Hurricane Dorian <br />and resulting increase in quantities shall be exempt from SC -6.026-5. All costs <br />of the OWNER's employees and costs of the ENGINEER'S Consultant incurred <br />by the OWNER due to the quantity increase resulting from Hurricane Dorian <br />shall be the responsibility of the COUNTY. <br />2. The following Bid Items have been added to the Contract to account for quantity changes <br />due to Hurricane Dorian: <br />Bid Item 1A — Mobilization/Demobilization Post Dorian has been added to the <br />Contract resulting in an increase in project cost of $27,772.02 to account for a 1.5% <br />bond increase. <br />Bid Item 2A — Environmental Compliance Post Dorian has been added to the <br />Contract resulting in an increase in project cost of $8,310.00 to account for 83,100 <br />additional tons of sand. <br />Bid Item 3A — Supply/Deliver/Place Sand Post Dorian has been added to the <br />Contract resulting in a project cost increase of $1,843,158.00 to account for the <br />additional 83,100 tons to be delivered to the project site. <br />The total Contract cost has increased $1,879,240.02 from $4,511,712.00 to <br />$6,390,952.02 as a result of Change Order No. 1. This Change Order did not result <br />in an increase in Contract Time. <br />IRC -1923 COI 20191210 <br />00942-1 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1923 Sector 5 Beach and Dune Restoration Project\1-Admin\Agenda\Change Orders\RioBak CO#1\IRC- <br />1923_C01_20191210.doc Rev. 05/01 <br />