Laserfiche WebLink
Mr. Himanshu H. Mehta, P.E. <br />19 November 2019 <br />Page 5 <br />Phase 2 — Semi -Annual Sampling and Reporting <br />Geosyntec will assist SWDD to perform the semi-annual sampling and prepare the water -quality <br />monitoring reports as required by the WQMP. Geosyntec will assist SWDD with conducting all <br />field sampling preparation activities, including scheduling, staffing, subcontracting, and field <br />equipment preparation. Geosyntec will subcontract Ideal Tech Services Inc. (ITS) to support the <br />groundwater and surface water sampling. Prior to collecting the groundwater samples in January <br />and July 2020, Geosyntec and ITS will perform water -level measurements from the 56 <br />groundwater monitoring wells and 1 staff gauge (SG -12). Geosyntec and ITS will then perform <br />semi-annual sampling of the Class I landfill and C&D debris disposal facility groundwater <br />monitoring wells in January (34 wells) and July (25 wells) of 2020. We will also perform semi- <br />annual (January and July) sampling of the surface water site (SW -2), if its discharging from the <br />stormwater pond. <br />It is estimated that data collection and sampling will take five (5) full days in January and four <br />(4) full days in July for the semi-annual monitoring and reporting for the Class I landfill and <br />C&D debris disposal facility. Geosyntec and ITS will deliver the samples to ENCO laboratory <br />for analytical testing under SWDD's contract (i.e., ENCO laboratory will directly invoice <br />SWDD). <br />The laboratory analytical testing will be conducted by ENCO testing laboratory. The samples <br />collected from the Class I landfill monitoring wells will be analyzed for the routine monitoring <br />parameters listed in paragraph 7 of the WQMP and in accordance with paragraph 62- <br />701.510(5)(c) & (7)(a), F.A.C. The samples collected from the C&D debris disposal facility <br />monitoring wells, with the exception of the quarterly assessment wells, will be analyzed for the <br />routine monitoring parameters listed in paragraph 8 of the WQMP and in accordance with 62- <br />701.739(8)(d), F.A.C. The samples from the surface water site (SW -2) will be analyzed for the <br />list of parameters listed in Section II1.2 of the Class I Landfill WQMP, as required by paragraphs <br />62-701.510 (5)(d) and (7)(b), F.A.C. Geosyntec will assist SWDD in coordinating the analytical <br />testing activities with ENCO, notify FDEP prior to sampling as required by the WQMP, review <br />and evaluate the analytical test results, and prepare the semi-annual reports. <br />The results of water -quality sampling under the WQMP will be presented in a report supported <br />by attachments containing chain -of -custody sheets, field notes and observations, water sampling <br />logs, maps, analytical results, and any other applicable materials. The reports will include <br />ground water completion report form and ground water elevation contour map, both signed and <br />sealed by a Florida registered professional engineer. These reports will be submitted to SWDD <br />for review prior to submittal to FDEP. The reports (in Adobe format) and analytical data <br />Electronic Data Deliverable (EDD) will be submitted electronically to FDEP using the ADaPT <br />NCP2019 2283/JL19022 2020 Compliance Monitorini4 Proposal <br />