Laserfiche WebLink
6. If Indian River's Manager or designee inspects the Load and disagrees with St. Lucie's <br /> determination, the representatives of Indian River and St. Lucie shall work together in good faith <br /> and thereby attempt to resolve their differences informally. In such cases, St. Lucie shall be <br /> bound by the requirements contained herein, including but not limited to the 25% threshold for <br /> Excessive Amounts of Non-Conforming Material, but St. Lucie shall retain the exclusive authority <br /> to decide whether it will accept or reject the Load at its Facility. <br /> Page 13 of 15 <br />