Laserfiche WebLink
handling, disposal or clean up of any hazardous materials that are dumped or released at the <br />Yard Waste Facility by any person other than Contractor. <br />C. Contractor shall remove and consolidate any Unacceptable Material dropped off improperly at <br />these material sites. Except as otherwise provided in Section 1.3(B), Contractor will haul these <br />Unacceptable Material and transport them to their proper disposal locations as directed by <br />Owner. <br />D. Contractor shall process all materials on site as needed to allow for a safe working environment. <br />Contractor is not allowed to remove unprocessed materials off-site without prior Owner <br />approval, i.e. hardwood logs removed off-site for processing. Contractor's submitted site <br />operating plan and health and safety plan are subject to approval by Owner. These plans need <br />to be submitted 30 Calendar Days before January 2, 2019 (the "Commencement Date"). <br />E. Processed material not utilized by Owner for landfill cover material or other beneficial uses will <br />be Contractor's responsibility to market and/or sell and provide all trucking at Contractor's <br />expense. The County will provide trucks to haul any mulch for beneficial use. <br />F. If the Contractor's equipment fails to operate for seven (7) Business Days, the Contractor will <br />utilize alternate equipment to process the material. <br />G. The incoming tonnage numbers to be used in billing will be generated by Owner's calibrated <br />scale operations, and any discrepancies shall be immediately brought to the attention of the <br />Owner Managing Director. The Contractor will be paid to handle and process all incoming <br />materials and paid to transport and recycle of all outgoing materials. The tonnage for the <br />outgoing materials and the materials utilized by Owner for landfill cover material or other <br />beneficial uses will be measured by Contractor using Loadrite on board loader scales. The other <br />beneficial use could include the use at the County golf course, County parks or for composting <br />purposes. <br />H. The Contractor will provide weights in tons all materials leaving the Yard Waste Facility or <br />Compost Facility for recycling credits, and billing purposes. <br />I. Acceptance of Intra -County Yard Waste. Contractor will not accept any Intra -County Yard Waste <br />at the Compost Facility. <br />J. Inter -County Yard Waste, Intra -County and Inter -County Food Waste and Intra -County and Inter - <br />County Biosolids. Owner and Contractor shall in good faith continue to develop and discuss <br />these opportunities and formalize a separate agreement for these items as an amendment to <br />this Agreement to be approved by Owner and Contractor. <br />K. Storm Debris. The exclusivity obligations of Owner contained in Section 1.2(B) shall not apply to <br />temporary services required for the processing and recycling of unusually large quantities of <br />Yard Waste (collectively, "Storm Debris") caused by a hurricane, natural disaster or other event <br />that results in an emergency response from the Federal Emergency Management Agency <br />(FEMA). <br />L. The Yard Waste Facility is provided as is; however, Owner is in the process of making some site <br />improvements to the Yard Waste Facility to provide better access for customers and to provide <br />Page 4 of 22 <br />